10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

SECTION 16010<br />

ELECTRICAL SPECIAL CONDITIONS<br />

PART 1 GENERAL<br />

1.01 SPECIAL NOTICE<br />

A. The general conditions of the contract and applicable requirements of the general condition<br />

govern this Division.<br />

B. Read all relevant documents, become familiar with the job, the scope of work, type of general<br />

construction, architectural, structural, mechanical and electrical drawings and the<br />

specifications. Become familiarized with the purpose for which these documents have been<br />

prepared and shall become cognizant of all the details involved. Coordinate work with that of<br />

others to the end that unnecessary delays be avoided.<br />

1.02 TERMS<br />

A. The term "Contractor" used in this division of the contract documents shall mean the<br />

contractor whose work is covered by this section.<br />

B. The term "Architect" used in this division of the contract documents shall mean the Architect of<br />

Record.<br />

C. The term "Engineer" used in this division of the contract documents shall mean the consulting<br />

electrical engineer.<br />

D. The term "furnish" used in this division of the contract documents shall mean to supply the<br />

work described.<br />

E. The term "install" used in this division of the contract documents means to fix in position the<br />

work described.<br />

F. The term "provide" used in this division of the contract documents means to furnish the<br />

material described for use by others.<br />

1.03 SCOPE OF WORK<br />

A. The work under this section to the specifications shall include all labor and materials noted,<br />

required or necessary for the complete electrical installation described herein and/or shown on<br />

the drawings. All work shall be completed to the entire satisfaction of the Architect and<br />

Engineer.<br />

B. This work includes, but is not limited to the following:<br />

1. Electric and signal services hereinafter specified and/or shown on the drawings including<br />

fees, permits, and provisions for metering equipment as required.<br />

2. Complete systems of distribution and utilization for light and power.<br />

3. Empty conduit systems for telephones an other miscellaneous<br />

communications systems.<br />

4. Lighting fixtures and lamps.<br />

5. Rough-in and the connections to mechanical equipment.<br />

6. Rough-in and the connections of equipment furnished by others.<br />

7. Complete signal systems as shown on the plans and/or hereinafter<br />

specified.<br />

1.04 CODES, STANDARDS AND PERMITS<br />

A. Obtain all permits, inspections and approvals as required by regulatory authorities. Pay all<br />

fees and costs of any nature whatsoever incidental to these permits, inspections and<br />

approvals. Pay any pro-rata costs for utilities serving this property.<br />

B. All materials and workmanship shall comply with all applicable codes, specifications,<br />

ordinances and utility company regulations.<br />

C. In case of difference between applicable codes, specifications, utility company regulations and<br />

the Contract Documents, the most stringent shall govern. Promptly notify the Architect in<br />

ELECTRICAL SPECIAL CONDITIONS 16010 - Page 1 of 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!