Bridgestone Retail Operations LLC..<br />

Invitation to Bid<br />

Telephone and Cable TV<br />

Include all required work to bring the telephone & cable TV cables to the building. Your bid should<br />

include (2) 4” underground conduit extending from the existing service to the point of service at the<br />

building, or as indicated on the Utility Plan.<br />

Follow these guidelines for the installation of the incoming Telecommunications conduit:<br />

‣ Four inch diameter conduit.<br />

‣ PVC or galvanized conduit.<br />

‣ Conduit is to be buried at least 36 inches deep from sub-soil level. For example, if the conduit<br />

goes under a road, driveway, or parking lot that will be paved concrete, the 36 inch measurement<br />

is from the soil level down. The depth of pavement or concrete that is placed on top of the soil is<br />

not counted in this measurement.<br />

‣ If power is in the same trench as telecommunication conduit, there must be a 12 inch separation<br />

between the power facility and Telco facilities. In this case, Telco would be at a minimum of 24<br />

inches preferably with power at 48 inches below sub-soil level and Telco at 36 inches below subsoil<br />

level.<br />

‣ In all cases, a minimum of six inches of “safe in” gravel above and below the conduits is<br />

recommended to protect the conduit from rocks and uneven trench base and from overburden<br />

(dirt clods and rocks) being backfilled in the trench. In the case of power and Telco using the<br />

same trench, safe-in gravel should be the medium separating the power and Telco.<br />

Water and Sewer<br />

Provide (furnish and install) all water and sewer services lines and associated accessories as indicated<br />

on the Civil Drawings and/or Plumbing Drawings.<br />

15 Scheduling<br />

a. The construction shall be completed in 150 days, INCLUDING average weather days,<br />

from the date of the Notice to Proceed. Based on past experience this is more than<br />

enough time to complete the project. There will be no extension of the Substantial<br />

Completion day. Liquidated Damages may be assessed for each day after the<br />

Substantial Completion day that the project is not complete. Refer to the Construction<br />

Contract and General Conditions for further details.<br />

b. On the 150th day the building should be 100% complete and ready to turnover to<br />

Firestone Store Operations Team. 100% complete means all contract work is complete<br />

including ALL punch-list items. With the project ready for “Turnover” to Firestone Store<br />

Operations Team. A detailed construction punch-list will be developed two weeks prior<br />

to the Substantial completion day. The Bridgestone Retail Operations LLC. Zone<br />

Construction Manager will also develop a finishes punch-list which may not be done until<br />

after the “Turnover” date which is expected to be minimal. 30 days after the store<br />

opening date the Bridgestone Retail Operations LLC. Zone Construction Manager will<br />

compile a final list of any outstanding “punch-list” items.<br />

c. No revision to the project schedule shall constitute a revision to the Contract time,<br />

milestone dates, substantial or final completion dates, or any Contract documents. In the<br />

event that the work in accordance with the project schedule is not maintained in a<br />

manner which allows completion within the Contract time frame, the General Contractor<br />

shall at its expense employ additional personnel including overtime labor which in<br />

July 5, 2012 Updated New Store Invitation to Bid Revised 07-05-2012 Page 9