Bridgestone Retail Operations LLC..<br />

Invitation to Bid<br />

12 Specific Construction Items<br />

a. Include cost of a Landscape Irrigation System, including sleeves between all landscaped<br />

areas as well as a sleeve from a landscaped island to the designated point inside the<br />

building to accommodate the Irrigation Time Control wiring. NOTE: The system shall be<br />

installed with “Bubblers” at all ornamental & canopy trees. As part of the close-out<br />

procedure, the Irrigation Installer and the Superintendent shall conduct a meeting with<br />

the FIRESTONE Store Manager to train the FIRESTONE Store Manager on the<br />

operation of the Irrigation Timer, recommended water times & frequencies, and standard<br />

maintenance procedures. Additionally, after the day that the GC turns the building over<br />

to the Owner (or Bridgestone Retail Operations LLC.) the contractor shall make visits to<br />

the site every two weeks for 12 months to inspect the plant material & irrigation system<br />

for any problems. There will be a 12 month warranty on all landscaping and irrigation<br />

work. Any part of the landscaping or irrigation system that dies or fails to perform to the<br />

satisfaction of the owner or Bridgestone Retail Operations LLC. shall be repaired or<br />

replaced as applicable at the sole cost of the General Contractor.<br />

b. The roofing system shall be as per the specifications including the extended 20 year<br />

warranty.<br />

c. Your bid should include the demolition of existing improvements as indicated on the Civil<br />

Drawings (including but not limited to buildings, sheds, septic tanks, etc.). No additional<br />

compensation will be paid to the GC for the demolition or removal of items that are<br />

visible from the surface of the ground or identified within the geotechnical investigation<br />

report that must be removed in order to construct the work indicated on the drawings.<br />

These items include but are not limited to: trees, culverts, existing debris, etc.<br />

d. Review the Geotech Report Carefully – Include all soil remediation/ rock removal work<br />

recommended or that can be reasonably construed from the log of borings. Include the<br />

cost of all such work in the base bid.<br />

e. Site grading shall be performed in accordance with these plans and specifications and<br />

the recommendations set forth in the Geotechnical Report referenced in this plan set.<br />

The contractor shall be responsible for removing and replacing the suitable materials as<br />

specified in the Geotechnical Report. All excavated or filled areas shall be compacted as<br />

outlined in the Geotechnical Report. Moisture content at time of placement shall be<br />

submitted in compaction report prepared by a qualified Geotechnical Engineer,<br />

registered with the state where the work is performed, verifying that all filled areas and<br />

sub-grade areas within the building pad area and areas to be paved have been<br />

compacted in accordance with these plans and specifications and the recommendations<br />

set forth in the Geotechnical Report. Sub-base material for sidewalks, curb, or asphalt<br />

shall be free of organics and other unsuitable materials. Should sub-base be deemed<br />

unsuitable by BSRO or BSRO representative, sub-base is to be removed and filled with<br />

approved fill material compacted as directed by the Geotechnical Report. All fill,<br />

compaction, and backfill materials required for utility installation shall be as per the<br />

recommendations provided in the Geotechnical Report and shall be coordinated with the<br />

applicable utility company specifications. The awarded General Contractor MUST be<br />

prepared to submit a per cubic yard cost for the following two volume items:<br />

i. Per cubic yard cost to remove and replace existing soils with structural fill.<br />

ii. Per cubic yard cost to remove and replace existing soils with select fill<br />

f. The GC is responsible for verifying the exact location and depth of the connection points<br />

of all sub-surface utilities prior to purchasing materials OR commencement of any work<br />

that connects to these existing utilities. If the connection points differ in any way<br />

July 5, 2012 Updated New Store Invitation to Bid Revised 07-05-2012 Page 7