Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

2.02 FABRICATION<br />

a. No additional requirements.<br />

PART 3 EXECUTION<br />

3.01 PROTECTION<br />

a. Safety Codes and Standards: The Contractor shall be solely responsible for performing<br />

the work in a safe and workmanlike manner. The Contractor shall be responsible for<br />

familiarizing himself with and complying with all safety requirements of the governing<br />

authorities having jurisdiction.<br />

b. Existing Utilities: Locate existing utilities underground by careful excavation before<br />

starting earthwork operations. If utilities are to remain in place, provide protection from<br />

damage during construction operations. Should uncharted or incorrectly charted piping<br />

or other utilities be encountered during excavation, consult the Architect immediately for<br />

directions as to procedure. Cooperate with Owner and public and private utility<br />

companies in keeping services and facilities in operation. Repair damaged utilities to<br />

satisfaction of utility owner.<br />

i. Do not interrupt existing utilities serving facilities occupied and used by the<br />

Owner or others, except when permitted in writing by Architect and then only<br />

after temporary utility services have been provided.<br />

c. Use of Explosives: Do not bring explosives onto site or use in work without the prior<br />

written permission of Architect. Contractor is solely responsible for the handling, storage,<br />

and use of explosive materials when their use is permitted.<br />

d. Protection of Persons and Property:<br />

3.02 EXCAVATION<br />

i. Barricade open excavations and post with warning lights as required for the<br />

safety of persons. Protect structures, utilities sidewalks, pavements, and other<br />

facilities immediately adjacent to excavations from damages caused by<br />

settlement, lateral movement, undermining, washout and other hazards.<br />

ii. Take precautions and provide necessary bracing and shoring to guard against<br />

movement or settlement of existing improvements or new construction.<br />

Contractor is entirely responsible for strength and adequacy of bracing and<br />

shoring, and for safety and support of construction from damage or injury caused<br />

by lack thereof or by movement or settlement.<br />

a. Excavation consists of the removal and disposal of all material encountered to obtain<br />

required elevations. Excavations shall be made to proper depth, with allowances made<br />

for clearances to install services and forms. Cuts shall be accurately shaped to crosssections<br />

and grades indicated.<br />

EARTHWORK 02200 – Page 2 of 5