Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

B. Mechanically Tamped: The Contractor shall place final granular backfill in maximum 8-inch<br />

layers (loose measure) and mechanically compact it to a density between 90% and 95% of<br />

the maximum density ASTM D-698 with a moisture content near optimum.<br />

C. Water Tamped: Not permissible in this project.<br />

3.16 SAND EMBEDMENT:<br />

A. When sand embedment is required on the drawings, the material used for sand shall be<br />

"builders sand", sandy loam, or other sand material that shall contain no more than 25% clay<br />

and shall be free of rock, lumps or clods.<br />

B. The Engineer shall be the judge as to the suitability of a material for use as sand embedment.<br />

C. Sand embedment shall be used only when the excavated material is not suitable for use as<br />

sand embedment.<br />

D. If the trench bottom is in a soil that conforms to the requirements for sand embedment the<br />

6 inches below the pipe need not be undercut.<br />

3.17 CRUSHED STONE EMBEDMENT:<br />

A. When crushed stone embedment is required on the drawings, the material used for<br />

embedment shall be angular crushed stone, in the general size range of 3/4" to 1/16" which<br />

has good stability. Crushed stone shall be graded in accordance with Size #67 or #68 of<br />

AASHTO M 43, ASTM D 448.<br />

3.18 CONCRETE EMBEDMENT:<br />

A. Concrete Embedment: When concrete embedment is required on the drawings, the concrete<br />

shall conform to Section 03300. Concrete embedment shall be allowed to cure for at least 24<br />

hours before placing initial backfill and at least 48 hours before placing final backfill unless<br />

approved otherwise by the Engineer.<br />

3.19 EXCESS AND UNSUITABLE MATERIAL:<br />

A. Excess and Unsuitable Material: All excess and/or unsuitable excavated material shall be<br />

loaded and hauled offsite by the Contractor and disposed of in a legal manner.<br />

END OF SECTION<br />

PIPE TRENCH EXCAVATION AND BACKFILL 02226 - Page 4 of 4