Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

SECTION 16721<br />

FIRE ALARM – CONDUIT AND PULL STRING ONLY<br />

PART 1 GENERAL<br />

1.01 FIRE ALARM SYSTEM<br />

A. SCOPE & RELATED DOCUMENTS<br />

1. Furnish and install conduit, and installation of conduit for the Fire Alarm System as described<br />

herein and as shown on the plans; a pull string shall be provided in the conduit by this<br />

contractor. Provide all outlet boxes, junction boxes, and all other necessary material for a<br />

complete installation.<br />

2. The Electrical Contractor shall provide conduit and wire for the 120vac power connection to<br />

the fire alarm panel. Electrical Contractor to furnish and install all conduit for all the fire alarm<br />

peripheral devices attached to the system. Electrical Contractor shall stub conduit up into the<br />

ceiling joist and leave a pull string in the conduit.<br />

3. The requirements of the conditions of the Contract, Supplementary Conditions and General<br />

Requirements, apply to the work specified in this section.<br />

4. The complete installation is to conform to the applicable sections of NFPA-72, Local Code<br />

Requirements and National Electrical Code with particular attention to Article 760.<br />

5. Additionally, the entire installed system and all integrated system operations shall be within<br />

the guidelines of the Basic Building Code.<br />

6. The work covered by this section of the specifications is to be coordinated with the related<br />

work as specified elsewhere under the project specifications.<br />

B. REFERENCES<br />

NEC (Current Edition)<br />

NFPA 72, the National Fire Alarm Code<br />

NFPA 101 - Life Safety Code®<br />

Building Code appropriate for this Jurisdiction.<br />

Other Applicable Codes and/or Standards<br />

1.02 CONDUIT AND WIRE<br />

A. POWER REQUIREMENTS<br />

1. The control panel shall receive 120VACpower as noted on the plans via a dedicated 20A,<br />

120vac, fused disconnect circuit. Electrical Contractor shall provide red over-current device<br />

with lock on breaker. Label in distribution panel as “Fire Alarm Circuit”. Wire shall be 12ga.<br />

copper in metal conduit.<br />

2. All circuits requiring system operating power shall be 24 VDC and shall be individually fused<br />

at the control panel.<br />

B. CONDUIT AND WIRE:<br />

1. Conduit:<br />

a. Conduit shall be in accordance with The National Electrical Code (NEC), local and state<br />

requirements and as described elsewhere in this specification.<br />

b. All wiring shall be installed in conduit or approved metallic raceway. Conduit fill shall not<br />

exceed 40 percent of interior cross sectional area where three or more cables are<br />

contained within a single conduit.<br />

c. Cable must be separated from any open conductors of power, or Class 1 circuits, and<br />

shall not be placed in any conduit, junction box or raceway containing these conductors,<br />

per NEC Article 760-29.<br />

FIRE ALARM (rev 2 2-11-10) 16721 - Page 1 of 2