Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

o<br />

o<br />

Ambient temperature during concrete placement.<br />

Type of fracture during the test.<br />

• At the start of each day’s mixing, report any significant deviations from approved mix<br />

designs including temperature, moisture and condition of aggregate.<br />

• Certify each delivery ticket of concrete. Report type of concrete delivered, amount of<br />

water added and time at which the cement and aggregate were loaded into the truck, and<br />

time at which concrete was discharged from the truck.<br />

3.07 Masonry Testing Specification<br />

The Testing Specifications listed below shall be executed without deviation in accordance with the<br />

Project Drawings and Specifications. Any discrepancies between these documents will be brought<br />

to the immediate attention of the Bridgestone Retail Operations, LLC Zone Construction Manager.<br />

All reports shall be made on 8-1/2 x 11 white papers, suitable for photocopying and binding in<br />

booklet form. All sheets shall have the Testing and Engineer’s letterhead (including phone number,<br />

address and email address). Larger sheets shall be folded and bound into the booklet. Reports<br />

shall include:<br />

a. Date issued<br />

b. Project title and number as it appears on the Contract Documents.<br />

c. Name of the inspector<br />

d. Name and seal of registered engineer in responsible charge.<br />

e. Date and time of sampling or inspection.<br />

f. Identification of product and specification section.<br />

g. Location of sampling or inspection in the Project.<br />

h. Type of inspection or test performed.<br />

i. Date of test.<br />

j. Results of test.<br />

k. Indicate conformance or non-conformance with the Contract Document requirements and<br />

provide Testing and Engineer’s interpretation of test or inspection results.<br />

All tests and inspections not conforming to the Contract Documents shall be stamped with a red<br />

stamp indicating non-0conrormance and distributed within 20 hours of discovery using the red letter<br />

format attached to this document.<br />

After each inspection or test, a report shall be distributed within three calendar days to:<br />

Bridgestone Retail Operations, LLC Zone Construction Manager<br />

SITE-Work Engineering Consultant<br />

Developer or Contractor<br />

Building Official<br />

Architectural Consultant<br />

1 copy<br />

1 copy<br />

3 copies<br />

as Required<br />

1 copy<br />

3.08 Testing Services and Inspection Services for Masonry Shall Include:<br />

Mortar Grout:<br />

a. Conduct strength tests in accordance with ASTM C1090 (UBC Std 24 – 28)<br />

• Take two strength samples for each 2500 square feet of masonry wall surface, for each<br />

type of group placed each day.<br />

• Create test samples by forming with wood surface on bottom and concrete block on sides.<br />

The samples shall be 3 inches square and 8 inches high.<br />

• Initial cure during first 48 hours. Protect samples from loss of moisture by covering with<br />

wet cloth and keeping moist. Protect from freezing and variations in temperature. Record<br />

maximum and minimum temperatures by using max. /min. thermometer.<br />

QUALITY REQUIREMENTS 01400 - Page 7 of 11