10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

SECTION 05120<br />

STRUCTURAL STEEL<br />

PART 1 GENERAL<br />

1.01 SECTION INCLUDES<br />

A. Structural steel framing members, support members, suspension cables, sag rods, and struts.<br />

B. Base plates, shear stud connectors and expansion joint plates.<br />

C. Grouting under base plates.<br />

1.02 SUBMITTALS<br />

A. Shop Drawings:<br />

1. Connections not detailed. Connections shall be prepared under the seal of a licensed<br />

structural engineer registered in the state of project construction.<br />

1.03 QUALITY ASSURANCE<br />

A. Fabricate structural steel members in accordance with AISC M016.<br />

PART 2 PRODUCTS<br />

2.01 MATERIALS<br />

A. Structural Steel Members: ASTM A 36/A 36M, or ASTM A992 GR50 as indicated on drawings.<br />

B. Cold-Formed Structural Tubing: ASTM A 500, Grade A.<br />

C. Steel Plate: ASTM A 514/A 514M.<br />

D. Pipe: ASTM A 53, Grade B, Finish black.<br />

E. Shear Stud Connectors: ASTM A 108 Grade -.<br />

F. Sag Rods: ASTM A 36/A 36M.<br />

G. High-Strength Bolts, Nuts, and Washers: ASTM A 325, Type 1, plain.<br />

H. Anchor Bolts: ASTM A 307, Grade C.<br />

I. Welding Materials: AWS D1.1; type required for materials being welded.<br />

J. Grout: Non-shrink, non-metallic aggregate type, complying with ASTM C 1107 and capable of<br />

developing a minimum compressive strength of 7,000 psi at 28 days.<br />

K. Shop and Touch-Up Primer: Fabricator's standard.<br />

2.02 FABRICATION<br />

A. Shop fabricate to greatest extent possible.<br />

B. Fabricate connections for bolt, nut, and washer connectors.<br />

C. Develop required camber for members.<br />

2.03 FINISH<br />

A. Prepare structural component surfaces in accordance with SSPC SP paint system guide no. 7.00.<br />

B. Shop prime structural steel members. Do not prime surfaces that will be fireproofed, field welded,<br />

in contact with concrete, or high strength bolted.<br />

PART 3<br />

EXECUTION<br />

3.01 ERECTION<br />

A. Erect structural steel in compliance with AISC S303.<br />

B. Allow for erection loads, and provide sufficient temporary bracing to maintain structure in safe<br />

condition, plumb, and in true alignment until completion of erection and installation of permanent<br />

bracing.<br />

C. Use carbon steel bolts only for temporary bracing during construction, unless otherwise specifically<br />

permitted on drawings. Install high-strength bolts in accordance with AISC S329.<br />

D. Grout solidly between column plates and bearing surfaces, complying with manufacturer's<br />

instructions for nonshrink grout. Trowel grouted surfaces smooth, splaying neatly to 45 degrees.<br />

END OF SECTION<br />

STRUCTURAL STEEL 05120 - Page 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!