10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

C. Sealants:<br />

1. All tape sealant is to be a pressure sensitive, 100 percent solid, sealing tape with a<br />

release paper backing. Provide permanently elastic, non-sagging, non-toxic, nonstaining<br />

tape sealant approved by the SSRS Manufacturer.<br />

2. The SSRS Manufacturer shall approve all joint sealant that will come into contact<br />

with the SSRS.<br />

2.07 FABRICATION<br />

A. Panels shall be produced by a Manufacturer meeting the requirements of section 1.02B.<br />

B. Fabricate trim, flashing, and accessories to Manufacturer’s specified profiles.<br />

2.08 PREFABRICATED PIPE FLASHINGS<br />

A. Pipe flashings shall provide a weathertight joint at projections through the roof, taking into<br />

account the thermal movement of the roof and the service temperature of the projection.<br />

Pipe flashings shall have an aluminum-flanged base ring.<br />

2.09 SNOW FENCE<br />

A. Acceptable Manufacturer:<br />

1. TRA-MAGE Roof Accessory Systems, which is located at: 1657 South 580 East,<br />

P.O. Box 682, American Fork, UT 84003, Tel: 801-756-8666;<br />

2. Or equal.<br />

B. Product:<br />

1. Snow Fence System C-2-1-Z clamp on for standing seam; Paintlock Steel, 16<br />

gauge; Powder Coated: Best match of roof color from manufacturer’s standard<br />

colors.<br />

PART 3 – EXECUTION<br />

3.01 SURFACE CONDITIONS<br />

A. Examination:<br />

1. The Contractor shall verify installed work of other trades that such work is complete<br />

to a point where the roofing system installation may commence.<br />

2. Verify that the substructure installation is in accordance with the approved shop<br />

drawings and SSRS Manufacturer’s requirements. Coordinate with SSRS<br />

Manufacturer to ensure that the substructure is installed to accommodate the<br />

appropriate clip spacing.<br />

B. Discrepancies:<br />

1. In event of discrepancy, notify the Professional of Record and Owner’s<br />

Representative.<br />

2. Do not proceed with installation until discrepancies have been resolved.<br />

C. Verify that roof openings, curbs, pipes, sleeves, ducts, vents, and other penetrations<br />

through roof substrate are complete.<br />

3.02 INSTALLATION<br />

A. Install the SSRS in accordance with Manufacturer’s instructions and approved shop<br />

drawings.<br />

B. Install the SSRS so that it is weathertight and allows for thermal movements.<br />

C. Avoid placing pipe penetrations through the panel seams.<br />

METAL ROOFING SYSTEMS Section 07411 - Page 4 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!