10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

SECTION 02200<br />

EARTHWORK<br />

PART 1 GENERAL<br />

1.01 DESCRIPTION<br />

a. The extent of earthwork and site grading, including preparation of subgrade for<br />

pavements where shown on the drawings. The following operations are included in this<br />

section of the specifications:<br />

i. Preparation of subgrade, complete.<br />

ii. Compacted fill under and around paving.<br />

iii. Excavation and backfilling, complete, including the footings and miscellaneous<br />

items.<br />

iv. Testing and Inspection Service: The Owner shall employ and pay for a testing<br />

and inspection service. Testing service will include soil survey for satisfactory<br />

soil materials, sampling and testing soil materials proposed for use in the work,<br />

and field testing facilities for quality control testing during earthwork operations.<br />

1.02 QUALITY ASSURANCE<br />

a. References<br />

1.03 SUBMITTALS<br />

i. ASTM D698 - Moisture Density Relations of Soils and Soil-Aggregate Mixture<br />

using 5.5 (2.49 kg) Rammer and 12 inch (305 mm) Drop.<br />

ii. ASTM D2167 - Test Methods for Density and Unit Weight of Soil In Place by the<br />

Rubber Balloon Method.<br />

iii. Texas State Department of Highways and Public Transportation, referred to as<br />

THD, Standard Specifications for Construction of Highways, Streets and Bridges,<br />

latest editions.<br />

iv. American Association of State Highways and Transportation Officials, referred to<br />

as AASHTO.<br />

a. Submit under provisions of Section 01300.<br />

1.04 STORAGE AND HANDLING<br />

a. Material Storage: Stockpile excavated materials classified as satisfactory soil material<br />

where directed, until required for fill; place, grade and shape stockpiles for proper<br />

drainage.<br />

PART 2 PRODUCTS<br />

2.01 MATERIALS<br />

a. Fill: In accordance with drawings.<br />

EARTHWORK 02200 – Page 1 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!