10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

1.07 DELIVERY, STORAGE & HANDLING<br />

A. Store products in manufacturer's unopened packaging until ready for installation.<br />

B. Store and dispose of solvent-based materials, and materials used with solventbased<br />

materials, in accordance with requirements of local authorities having<br />

jurisdiction.<br />

1.08 PROJECT CONDITIONS<br />

A. Maintain environmental conditions (temperature, humidity, and ventilation) within<br />

limits recommended by manufacturer for optimum results. Do not install products<br />

under environmental conditions outside manufacturer's absolute limits.<br />

1.09 WARRANTY<br />

A. Manufacturer/installer has responsibility for an extended Corrective Period for work<br />

of this Section for the period stated from date of Substantial Completion against all<br />

the conditions indicated below, and when notified in writing from Owner.<br />

B. Manufacturer/installer shall promptly and without inconvenience and cost to Owner<br />

correct deficiencies:<br />

1. Failure due to defective materials and workmanship.<br />

2. Failure due to programming and embedded factory installed system<br />

information.<br />

C. Contractor/manufacturer/installer shall be notified immediately of defective products,<br />

and be given a reasonable opportunity to inspect the goods prior to return.<br />

Manufacturer will not assume responsibility, or compensation, for unauthorized<br />

repairs or labor.<br />

PART 2 PRODUCTS<br />

2.01 MANUFACTURERS<br />

A. Provide a Model GVU-1 Carbon Monoxide (CO) detection and control system as<br />

specified on drawings.<br />

B. Acceptable Manufacturer: TOXALERT INTERNATIONAL, INC., P.O. Box 159,<br />

MOUND, MN 55364 Phone 952.472.4541, Fax 972.472.4960 www.toxalert.com<br />

PART 3 EXECUTION<br />

3.01 EXAMINATION<br />

A. Compliance: Comply with manufacturer's Data Sheet including product technical<br />

bulletins, product catalogue installation instructions and product carton instructions<br />

for installation.<br />

B. Site Verification of Conditions: Verify substrate conditions are acceptable for product<br />

installation in accordance with manufacturer's instructions.<br />

C. Do not begin installation until areas, supporting construction and substrates have<br />

been properly prepared.<br />

D. If preparation is the responsibility of another installer, notify Architect of<br />

unsatisfactory preparation before proceeding.<br />

GAS DETECTION AND ALARM 13850- PAGE 4 OF 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!