10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

3. Finish Rolling: Perform finish rolling while mixture is still warm enough for<br />

removal of roller marks. Continue rolling until roller marks are eliminated and<br />

course has attained maximum density.<br />

C. Patching: Remove and replace paving areas mixed with foreign materials and defective<br />

areas. Cut out such areas and fill with fresh hot asphalt concrete. Compact by rolling to<br />

maximum density and smoothness.<br />

D. Protection: After final rolling, do not permit vehicular traffic on pavement until pavement<br />

has cooled and hardened. Erect barricades to protect paving from traffic until mixture has<br />

cooled enough not to become marked.<br />

END OF SECTION<br />

ASPHALT PAVING 02530 - Page 3 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!