Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

which provides the NAFS certification.<br />

F. Skylights must be certified by the NFRC.<br />

G. Skylights must be certified by the NAFS.<br />

H. Smoke Hatch/Smoke Venting Skylights must be Factory Mutual approved.<br />

2.05 INSPECTION<br />

A. Firestone will conduct a “First Article Inspection” of vendor’s formal submission from a<br />

representative production batch/run. This inspection includes subjecting the submission to full<br />

QA/QC and physical testing (including dimensions), as well as examination of all packaging,<br />

labeling and lot numbering.<br />

B. Firestone reserves the right to sample any material shipped and test any provision of the<br />

referenced product specification at any time.<br />

2.06 PACKAGING AND MARKING<br />

A. Each dome shall be marked with a small 2” x 1-1/2” label on the aluminum frame. See attachment.<br />

B. Skylight daylighting components shall be carefully packaged on wooden skids.<br />

PART 3 EXECUTION<br />

3.01 EXAMINATION<br />

A. Prior to beginning work of this section, an authorized representative shall examine the associated<br />

support structure to determine that it is properly prepared and ready to received the skylight work<br />

included herein. No installation shall proceed until any discrepancies have been resolved.<br />

3.02 PREPARATION<br />

A. Aluminum surfaces in contact with masonry, concrete or dissimilar materials, if not organically<br />

coated, shall be given a heavy coat of zinc chromate or bituminous paint.<br />

3.03 INSTALLATION<br />

A. Skylight installation shall be the sole responsibility of the General Contractor in strict accordance<br />

with the skylight manufacturer instructions.<br />

B. Install skylights plumb, true without warping or racking of panels.<br />

C. Anchor system in strict accordance with manufacturer’s instruction.<br />

D. During erection, provide for thermal movement with a minimum ambient air temperature shift of<br />

100 0 Farenheight without creating undue stresses.<br />

E. Apply sealant where required by manufacturer. Before application, clean surfaces as<br />

recommended by manufacturer.<br />

3.04 TOLERANCES<br />

A. All parts of the work, when completed, shall be within the following tolerances:<br />

1. Maximum variation from plane or location shown on approved shop drawings: 1/8” per 12<br />

METAL FRAMED SKYLIGHT / SMOKE VENT 08625 - Page 5 of 6