Bismarck Real Estate Partners, Inc.<br />

PROJECT MANUAL<br />

PART 3 - EXECUTION<br />

3.01 ERECTION<br />

A. Metal roof deck shall be erected and fastened in accordance with the SDI Specifications and<br />

the manufacturer's specifications and erection layouts. Metal roof deck shall be continuous<br />

over at least three spans. Cutting openings through the deck which are less than 16 square<br />

feet in area and all skew cutting shall be performed in the field. All cutting of metal roof deck<br />

shall be by metal cutting saw only. No torch cuts or jagged edges are acceptable.<br />

B. Top and bottom faces and edges of deck materials where cuts have been made including all<br />

deck welds shall have prime coating touched-up with a heavy coat of the same type of paint<br />

as the shop coat.<br />

C. Repair Painting: Wire brush and clean rust spots, welds, and abraded areas on both surfaces<br />

of prime-painted deck immediately after installation, and apply repair paint.<br />

D. Do not hang or support any loads from metal roof deck.<br />

E. When stored on site, keep deck covered, clean, and protected against dirt, mud and rust. All<br />

deck damaged, dented, chipped, punctured or otherwise deformed (including weld blow holes<br />

in deck from welding) during shipping, storage or erection to render it unusable or unsightly<br />

shall be replaced at no additional cost to the Owner. The Owner Representative shall be the<br />

sole judge as to whether metal roof deck must be replaced.<br />

END OF SECTION<br />

METAL DECK 05320 - Page 2 of 2