10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

Table 1<br />

Grading Requirements for Bedding Sand<br />

ASTM C 33<br />

Sieve Size Percent Passing<br />

3/8 in. (9.5 mm)<br />

No. 4 (4.75 mm)<br />

No. 8 (2.36 mm)<br />

No. 16 (1.18 mm)<br />

No. 30 (600 µm)<br />

No. 50 (300 µm)<br />

No. 100 (150 µm)<br />

100<br />

95 to 100<br />

85 to 100<br />

50 to 85<br />

25 to 60<br />

10 to 30<br />

2 to 10<br />

Bedding sand may be used for joint sand. However, extra effort in sweeping and compacting<br />

the pavers may be required in order to completely fill the joints. If joint sand other than bedding<br />

sand is used, the gradations shown in Table 2 are recommended. Joint sand should never be<br />

used for bedding sand.<br />

C. The joint sand shall conform to the grading requirements of ASTM C 144 as shown in<br />

Table 2 below:<br />

Table 2<br />

Grading for Joint Sand<br />

ASTM C 144<br />

Sieve Size<br />

No. 4 (4.75 mm)<br />

No. 8 (2.36 mm)<br />

No. 16 (1.18 mm)<br />

No. 30 (600 µm)<br />

No. 50 (300 µm)<br />

No. 100 (150 µm)<br />

No. 200 (75 µm)<br />

Natural Sand<br />

Percent Passing<br />

100<br />

95 to 100<br />

70 to 100<br />

40 to 75<br />

10 to 35<br />

2 to 15<br />

0<br />

PART 3 EXECUTION<br />

3.01 EXAMINATION<br />

For installations on a compacted aggregate base and soil subgrade, the specifier should be<br />

aware that the top surface of the pavers may be 1/8 to 1/4 in. (3 to 6 mm) above the final<br />

elevations after compaction. This difference in initial and final elevations is to compensate for<br />

possible minor settling.<br />

INTERLOCKING CONCRETE PAVERS 02518 - Page 4 of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!