Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

PART 3 REQUIRED TESTS – Excerpts from Construction Material Testing and Observation<br />

Agreement<br />

3.01 Site and Building Excavation and Backfilling Testing Specification<br />

The Testing Specifications listed below shall be executed without deviation in accordance with the<br />

Project Drawings and Specifications. Any discrepancies between these documents will be brought<br />

to the immediate attention of the Bridgestone Retail Operations, LLC Zone Construction Manager.<br />

All reports shall be made on 8-1/2 x 11 white papers, suitable for photocopying and binding in<br />

booklet form. All sheets shall have the Testing and Engineer’s letterhead (including phone number,<br />

address and email address). Larger sheets shall be folded and bound into the booklet. Reports<br />

shall include:<br />

a. Date issued<br />

b. Project title and number as it appears on the Contract Documents.<br />

c. Name of the inspector<br />

d. Name and seal of registered engineer in responsible charge.<br />

e. Date and time of sampling or inspection.<br />

f. Identification of product and specification section.<br />

g. Location of sampling or inspection in the Project.<br />

h. Type of inspection or test performed.<br />

i. Date of test.<br />

j. Results of test.<br />

k. Indicate conformance or non-conformance with the Contract Document requirements and<br />

provide Testing and Engineer’s interpretation of test or inspection results.<br />

All tests and inspections not conforming to the Contract Documents shall be stamped with a red<br />

stamp indicating non-0conrormance and distributed within 20 hours of discovery using the red letter<br />

format attached to this document.<br />

After each inspection or test, a report shall be distributed within three calendar days to:<br />

Bridgestone Retail Operations, LLC Zone Construction Manager<br />

SITE-Work Engineering Consultant<br />

Developer or Contractor<br />

Building Official<br />

Architectural Consultant<br />

1 copy<br />

1 copy<br />

3 copies<br />

as Required<br />

1 copy<br />

3.02 Inspection Services for Site and Building Excavation and Backfilling shall include:<br />

1. Prior to placement of backfill materials in the floor slab and parking areas observe the<br />

subgrade to determine that the soils are suitable for support of the floor slab.<br />

2. Observe proof rolling operations in any remaining, accessible areas of the subgrade in the<br />

building and pavement areas to identify and report any soft or unstable soils prior to any<br />

placement of fill or base coarse material across the site.<br />

3. Within the building area, perform one (1) test for every 100 cubic yards of fill and backfill or in<br />

areas of natural grade or cut, one (1) test for every 1000 square feet, except that such tests<br />

must be located as to give equal coverage to all portions of the building sub-grade.<br />

4. Within the paved areas of the site except trench excavations, one (12) test for every 500<br />

cubic yards of fill or in area of natural grade or cut one (1) test for every 2000 square feet.<br />

a. Within trench excavations provide one (1) test for every 200 cubic yards or 50 linear feet of<br />

fill or back fill.<br />

QUALITY REQUIREMENTS 01400 - Page 3 of 11