Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

3.06 MAINTENANCE<br />

a. Protection of existing site:<br />

i. Carefully maintain benchmarks, monuments, layout stakes and other reference<br />

points.<br />

ii. Protect property, including adjoining property and public right-of-ways, from<br />

damage by trucks and equipment.<br />

b. Protection of graded Areas:<br />

i. Protect newly graded areas from traffic and erosion, and keep free of trash and<br />

debris.<br />

ii. Repair and re-establish grades in settled, eroded, and rutted areas to the<br />

specified tolerances.<br />

c. Reconditioning Compacted Areas: When completed compacted areas are disturbed by<br />

subsequent construction operations or adverse weather, scarify the surface, reshape and<br />

compact to the required density prior to further construction. Use hand tamping for<br />

recompaction over underground utilities, if any.<br />

3.07 DISPOSAL OF EXCESS AND WASTE MATERIALS<br />

a. Transport waste material, including excavated material classified as unsatisfactory soil<br />

material, trash, and debris to designate spoil areas on the Owner's property and dispose<br />

of as directed.<br />

b. Remove all waste materials, including excavated material classified as unsatisfactory soil<br />

material, trash, and debris, from the Owner's property and legally dispose of it.<br />

3.08 FIELD QUALITY CONTROL<br />

a. Submit test and inspection reports under provisions of Section 01400-Quality Requirements.<br />

b. Testing Laboratory Services:<br />

i. Tests for Proposed Soil Materials: The testing service will determine the suitability of<br />

all materials to be used as fills. Submit one moisture-density curve for each type of<br />

soil encountered in sub grade and used as fill. Determine maximum densities in<br />

accordance with ASTM D698, current issue.<br />

ii. Testing service must inspect and approve all sub grades and fill layers before further<br />

construction work is performed thereon. Each sub grade and fill layer shall be tested<br />

for in-place density and moisture content in accordance with ASTM D2167 at a<br />

frequency as defined in Section 01400 Quality Requirements.<br />

3.09 WARRANTY/GUARANTEE<br />

A. Contractor shall be responsible for additional work as may be required to correct work which<br />

does not conform to specified requirements, including density and tolerances.<br />

END OF SECTION<br />