Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

SECTION 07540<br />

MEMBRANE ROOFING SYSTEM<br />

PART 1 - GENERAL<br />

1.01 DESCRIPTION<br />

A. A Mechanically-Fastened Roofing System incorporates a 10’ or 8’ wide (white) .060” thick, scrim-reinforced,<br />

Thermoplastic Polyolefin (TPO) membrane. Insulation is mechanically fastened to an acceptable roof deck.<br />

Provide perimeter sheets (5’ or 4’ wide respectively) installed along the building edges and field membrane<br />

sheets are mechanically fastened to the roof deck with the appropriate Manufacturer Fasteners and<br />

Fastening Plates. Adjoining sheets of membrane are overlapped and joined together with a minimum 1-1/2”<br />

wide hot air weld.<br />

B. System selection should be adequate to perform per manufacturer’s guidelines as dictated by local codes<br />

and jurisdictions. Roofing supplier/installer shall verify local acceptance of materials for use in high wind and<br />

coastal areas.<br />

1.02 QUALITY ASSURANCE<br />

A. This roofing system must be installed by a Manufacturer Authorized Roofing Applicator in compliance with<br />

shop drawings as approved by Manufacturer.<br />

B. Upon completion of the installation, an inspection will be conducted by a Technical Representative of<br />

Manufacturer to ascertain the roofing system has been installed according to Manufacturer's specifications<br />

and details.<br />

C. This roofing system meets Underwriters Laboratories (UL) and Factory Mutual (FM) requirements (minimum<br />

required FM design is FM Class1A-90).<br />

1.03 ACCEPTABLE PRODUCTS/MANUFACTURERS:<br />

A. Firestone Building Products Co., Carmel, IN.<br />

1.04 SUBMITTALS<br />

A. The contractor shall prepare all shop drawings, product literature, etc. as required to properly coordinate and<br />

construct the project, and as per the requirements of the Project Manual. Submit the following items for<br />

review by the Professional of Record in accordance with Section 01300, Submittals.<br />

B. For all projects (prior to project inspection by Manufacturer) a final shop drawing must be approved by<br />

Manufacturer, for use on specific location.<br />

1.05 QUALITY ASSURANCE<br />

A. Applicator Qualifications: Roofing installer shall have the following:<br />

1. Current Firestone Master Contractor status.<br />

1.06 RODUCT DELIVERY, STORAGE AND HANDLING<br />

A. Deliver materials to job site in original, unopened containers labeled with the manufacturer's name, brand<br />

name and installation instructions.<br />

B. Job site storage temperatures in excess of 90°F may affect shelf life of curable materials (i.e., uncured<br />

flashing, adhesives, sealants, primers, SecurTape, Pourable Sealer and Pressure-Sensitive Flashings).<br />

C. When liquid adhesives and sealants are exposed to lower temperatures, restore to a minimum of 60°F before<br />

use. Do not store adhesive containers with opened lids due to loss of solvent, which will occur from flash off.<br />

D. Insulation and underlayment must be stored so it is kept dry and is protected from the elements. Store<br />

insulation on a skid and completely cover with a breathable material such as tarp or canvas. If the insulation<br />

is lightweight, it should be weighted to prevent possible wind damage.<br />

MEMBRANE ROOFING SYSTEM 07540 - Page 1 of 6