Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

2.05 FERTILIZER:<br />

A. Shall be (13-13-13) at 2lbs per l,000 square feet.<br />

PART 3 EXECUTION<br />

3.01 LAWN PREPARATION:<br />

A. Tilling and Grading:<br />

1. Areas that have become hardened and non-porous because of construction<br />

activities, shall be loosened by rototilling, disking, harrowing, or any<br />

approved method.<br />

2. All areas to receive seed will be hand and machine raked and graded after<br />

tilling. Remove all large lumps of clay, debris, stones, etc., before<br />

hydromulching.<br />

3.02 LANDSCAPE MAINTENANCE:<br />

A. After hydromulching, maintain the lawn area and keep constantly moist until the seed<br />

has germinated and the grass begins to spread. After this, water the grass less<br />

frequently but more thoroughly at each watering.<br />

B. The Contractor will be responsible for watering and necessary maintenance of all<br />

installed materials until final acceptance by the Owner. Maintenance will include:<br />

1. Weeding.<br />

2. Mowing.<br />

3. Edging grass.<br />

4. Watering.<br />

C. Water will be available on the site at no expense to the Contractor.<br />

3.03 CLEANUP:<br />

A. All areas are to be kept as neat and clean as possible during the installation process.<br />

All trash and debris generated will be removed from the project daily.<br />

B. Final clean up will include removal of all landscape debris from the site. All walks and<br />

curbs will be broomed cleaned, unless otherwise directed by the Owner.<br />

END OF SECTION<br />

HYDROMULCHING NEW LAWNS 02482 – Page 2 of 2