Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

X. TEMPORARY LIGHT, HEAT, POWER, WATER AND TELEPHONE<br />

1. Contractor shall provide all temporary light and power necessary to the operation under this<br />

contract, including connections needed to supply same. He shall also provide water and<br />

toilet facilities for his men and all other operations in connection with the building and remove<br />

all temporary lines and connections at completion of the work.<br />

2. The Contractor shall furnish all fuel and provide heat if it is necessary to protect the<br />

construction, provide for safety of materials and personnel, and make possible the<br />

expeditious handling of the performance of this contract. Owner shall approve method of<br />

heating used which shall comply with OSHA requirements, local and national codes.<br />

3. Contractor shall provide a temporary construction telephone at the job site when one is not<br />

already there.<br />

4. Reference Invitation To Bid Section 11: Temporary Facilities for additional requirements.<br />

Y. SHORING AND BRACING<br />

1. Contractor shall provide all permanent and temporary bracing, shoring, and anchoring that<br />

the nature of his work may require in order to make everything absolutely stable and secure<br />

even where such bracing, shoring, and anchoring are not explicitly called for. Contractor will<br />

be held strictly accountable for any damage or injury resulting from judgment or for any other<br />

cause.<br />

2. Contractor shall do all underpinning or shoring that may be necessary to properly execute<br />

the work or for protection of adjoining property under local code or law.<br />

Z. PROTECTION AGAINST INJURY OR DAMAGE<br />

1. Contractor shall protect from damage the work finished and furnished by him or others. He<br />

shall protect if from loss resulting from carelessness, the elements or any other causes,<br />

except for damage by perils covered by the usual fire and extended coverage risk assumed<br />

by the Owner. He shall protect the entire work until it is completed and accepted by Owner.<br />

Owner will not carry individual policies at different sites as owner is self-insured and will<br />

assume the following risk: In case the building or building materials shall be destroyed, in<br />

whole or in part, by any of the perils covered under the fire and extended coverage<br />

insurance on the usual standard form of insurance policy in use in the state within which the<br />

site is situated, Owner shall cover damages. Normal perils that are covered include fire, Acts<br />

of God, vandalism, and malicious mischief. Theft and collapse are not covered.<br />

2. Contractor shall replace any part of the work which is damaged as described above prior to<br />

the time the entire work is completed and accepted by Owner. Contractor shall also protect<br />

and hold Owner harmless from any damage to adjacent property arising out of the<br />

performance of this Contract.<br />

AA.<br />

FINAL CLEAN-UP AND REMOVALS<br />

1. Contractor is responsible for cleanliness of the service area floor. He shall use diligence to<br />

prevent oil spills, marking of floor by equipment or materials or any other discoloration or<br />

roughness. All spills/marks shall be cleaned up immediately.<br />

2. At the completion of work, Contractor shall remove all his rubbish from and about the<br />

building or premises, all his tools scaffolding and surplus materials. He shall leave his work<br />

"Broom-Clean" or its equivalent, unless more exactly specified.<br />

GENERAL PROJECT REQUIREMENTS 01002 - Page 6 of 7