Bridgestone Retail Operations LLC..<br />

Invitation to Bid<br />

18 Warranty<br />

q. Execute periodic cleaning to keep building, site, and adjacent properties free of<br />

accumulations of waste materials, debris, rubbish, and windblown debris resulting from<br />

construction operations.<br />

r. Prior to Bridgestone Retail Operations LLC. Turnover and Fixture Day remove<br />

construction tools, scaffolding, equipment, machinery, and surplus materials.<br />

s. Broom clean and vacuum interior areas prior to start of surface finishing, and continue<br />

cleaning to eliminate any accumulation of dust.<br />

t. Schedule cleaning operations so that dust and other contaminants will not fall on or<br />

adhere to wet or newly coated surfaces.<br />

u. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other<br />

closed or remote spaces, prior to enclosing space.<br />

v. Store volatile wastes in covered metal containers and remove from premises daily.<br />

Prevent accumulation of waste which creates hazardous conditions. Provide adequate<br />

ventilation during use of volatile or noxious substances.<br />

w. Do not throw materials from heights.<br />

x. Collect and remove waste materials, debris, and rubbish from site daily until execution of<br />

final cleaning and dispose off site in lawful manner.<br />

y. Conduct cleaning and disposal operations to comply with local ordinances and<br />

anti-pollution laws.<br />

z. Do not burn or bury rubbish and waste materials on Project site. Do not dispose of<br />

volatile wastes or hazardous materials such as mineral spirits, oil, or paint thinner in<br />

storm or sanitary drains. Do not dispose of wastes into streams or waterways.<br />

aa. CONTRACTOR NOTE: As per the Ashford Formula installation instructions fureseal<br />

hardener is to be applied to new concrete as soon as the concrete is firm<br />

enough to work on after toweling. This is critical to proper application on floors<br />

that ARE NOT going to be dyed or stained and must be verified by the General<br />

Contractor. Contractor is to provide photographs of the application uploaded onto<br />

projectmates as a part of the weekly Project Status Report Curecrete Distribution,<br />

Inc. contact is Brent Green, email Brent.Green@ashfordformula.com.<br />

1. You must provide a warranty for 1 year after Firestone opens the store for business, or as noted<br />

in the contract documents requiring a longer warranty period, all warranty periods begin upon<br />

with the store opening date. During the 11 th month of the warranty, a final “warranty walkthrough”<br />

will be done to identify any items that should be corrected under the scope of warranty<br />

work. The complete cost to return and participate in the 11 th month final “warranty walkthrough”<br />

is included within the cost of the Contract for Construction.<br />

2. After Firestone opens for business, Contractor shall repair any outstanding problems within 24<br />

hours notice from Owner. In the event the repair is not completed within such 24-hour period,<br />

the Owner shall have the right, but not the obligation, to have the problem repaired and receive<br />

immediate reimbursement from the Contractor or deduct such cost from any amount owed to the<br />

Contractor. Contractor shall notify each subcontractor of this provision.<br />

July 5, 2012 Updated New Store Invitation to Bid Revised 07-05-2012 Page 15