Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

D. Expansion Loops: Construct by wrapping wire around 1/2 inch diameter pipe to create<br />

coil. A 3 foot section of wire shall be used to create 12 inch coil with 6 foot section being<br />

used to create 24 inch coil.<br />

1. Provide 12 inch coils at each wire splice, not including valves, and at each<br />

change of wire direction.<br />

2. Provide 24 inch coils at each control valve and where each valve enters conduit<br />

for automatic controller.<br />

3.09 BACKFILLING<br />

A. Sand or fine-grained soils shall be used for initial backfill to sufficient depth to prevent<br />

damage to pipe from rocks or other debris during compaction of subsequent backfill.<br />

B. Fill trench to within 3 inches of finish grade with excavated soil and compact in accordance<br />

with Section 02300.<br />

C. Fill top 3 inches with existing topsoil in planting or turf areas and wheel roll until<br />

compaction of backfill is same as surrounding soil.<br />

D. Grade backfilled trench uniform with surrounding grades.<br />

3.10 BACKFLOW PREVENTOR<br />

A. Comply with local codes for installation of backflow preventor. In absence of local codes,<br />

install in ac-cordance with manufacturer's written instructions.<br />

B. Provide combination of drains and quick coupler valves to accommodate winterization of<br />

entire system by forced air. Submit materials and methods to Owner for consideration and<br />

receive approval prior to installation of work.<br />

3.11 AUTOMATIC CONTROLLER<br />

A. Location and installation shall be as shown on the Drawings and approved by Owner prior<br />

to installa-tion.<br />

B. Provide rigid conduits for both power supply and control wiring.<br />

1. Control wire conduit shall extend to 18 inches below grade.<br />

2. Secure conduit to wall with anchors and screws.<br />

C. Provide electrical grounding for controller in accordance with manufacturer's written<br />

instructions.<br />

3.12 FIELD QUALITY CONTROL<br />

A. Inspection and Adjustments: Following installation, make final adjustments to lawn<br />

irrigation system prior to Owner's final inspection.<br />

1. Flush system completely, with nozzles and screens removed, to extract debris.<br />

2. Verify sprinkler operation and alignment for direction of throw. Correct as<br />

necessary.<br />

3. Check pop-up spray nozzling for proper arc of spray with no overthrow onto<br />

pavement. Adjust nozzles as necessary for proper throw.<br />

4. Insure uniform distribution exists.<br />

5. Insure proper sprinkler head operational after landscaping and/or sod installation.<br />

B. Demonstration: Following final adjustment, operate entire installation to demonstrate<br />

complete and successful operation of equipment.<br />

END OF SECTION<br />

IRRIGATION SYSTEM 02810 - Page 8 of 8