10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

feet of length or ½” in total length.<br />

2. Maximum offset from true alignment between two members abutting end-to-end, edge-toedge<br />

in line or separated by less than 3”: 1/32”.<br />

3.05 CLEANING AND PROTECTION<br />

A. Glazing panels shall be left in scratch free condition inside and out.<br />

B. Remove all debris created by this work.<br />

END OF SECTION<br />

METAL FRAMED SKYLIGHT / SMOKE VENT 08625 - Page 6 of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!