Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

C. Work edges of slabs, gutters, back top edge of curb, and formed joints with an edging<br />

tool, and round to 1/2-inch radius, unless otherwise indicated. Eliminate tool marks on<br />

concrete surface.<br />

3.07 CURING<br />

D. After completion of floating and when excess moisture or surface sheen has disappeared,<br />

complete troweling and finish surface as follows:<br />

1. Broom finish by drawing a fine-hair broom across concrete surface perpendicular<br />

to line of traffic. Repeat operation if required to provide a fine line texture<br />

acceptable to Architect.<br />

E. Do not remove forms for 24 hours after concrete has been placed. After form removal,<br />

clean ends of joints and point-up any minor honeycombed areas. Remove and replace<br />

areas or sections with major defects, as directed by Architect.<br />

A. Protect and cure finished concrete paving in compliance with applicable requirements of<br />

Division 3 sections. Use membrane-forming curing and sealing compound or approved<br />

moist-curing methods.<br />

3.08 REPAIRS AND PROTECTIONS<br />

A. Repair or replace broken or defective concrete, as directed by Architect.<br />

B. Drill text cores where directed by Architect when necessary to determine magnitude of<br />

cracks or defective areas. Fill drilled core holes in satisfactory pavement areas with<br />

portland cement concrete bonded to pavement with epoxy adhesive.<br />

C. Protect concrete from damage until acceptance of work. Exclude traffic from<br />

pavement for at least 14 days after placement. When construction traffic is permitted,<br />

maintain pavement as clean as possible by removing surface stains and spillage of<br />

materials as they occur.<br />

D. Sweep concrete pavement and wash free of stains, disco before final inspection.<br />

END OF SECTION<br />

PORTLAND CEMENT CONCRETE PAVING 02520 - Page 5 of 5