10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

3.01 INSTALLATION<br />

A. Route wire and cable as required to meet project conditions.<br />

1. Wire and cable routing indicated is approximate unless dimensioned.<br />

2. Where wire and cable destination is indicated and routing is not shown, determine exact<br />

routing and lengths required.<br />

3. Include wire and cable of lengths required to install connected devices within 10 ft of location<br />

shown.<br />

B. Install wire and cable in accordance with the NECA "Standard of Installation."<br />

3.02 FIELD QUALITY CONTROL<br />

A. Inspect and test in accordance with NETA STD ATS, except Section 4.<br />

B. Perform inspections and tests listed in NETA STD ATS, Section 7.3.1.<br />

END OF SECTION<br />

BUILDING WIRE AND CABLE 16123 - Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!