Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

SECTION 15010<br />

SUPPLEMENTARY MECHANICAL CONDITIONS<br />

PART 1 GENERAL<br />

1.01 GENERAL AND SUPPLEMENTARY GENERAL CONDITIONS: Shall be made a part of this section.<br />

The Contractor shall read all sections of the specifications in order to thoroughly understand the nature<br />

of the entire project, the requirements for coordination among the several trades, and items in other<br />

sections which apply to the mechanical work.<br />

1.02 SCOPE OF WORK : Furnish all labor, materials, services, equipment and appliances required for the<br />

complete furnishing and installation of the mechanical systems.<br />

1.03 RELATED WORK SPECIFIED ELSEWHERE:<br />

A. Finish painting unless specified otherwise in another section: Refer to Section: PAINTING.<br />

B. Electrical Work: Refer to Section: ELECTRICAL.<br />

1.04 UTILITIES, LOCATIONS AND ELEVATIONS:<br />

A. Locations and elevations of the various utilities, included within the scope of this contract, have<br />

been obtained from as-built plans and/or other substantially reliable sources and are offered<br />

separate from the contract documents as a general guide only, without guarantee as to accuracy.<br />

The Contractor shall examine the site and shall verify to his own satisfaction the locations and<br />

elevations of all utilities and shall adequately inform himself of their relation to his work.<br />

B. The Contractor shall arrange and pay for connections to the various utilities as indicated, as well<br />

as provide for all meters, meter settings, pads, pits, and covers required by the Utility Company.<br />

1.05 PERMITS AND APPROVALS:<br />

A. All work done under this contract shall comply with all local and state codes having jurisdiction<br />

and with the requirements of the Utility Companies whose services may be used. All<br />

modifications required by these codes shall be made by the Contractor without additional charge.<br />

Where code requirements are less than those shown on the plans or in the specifications, the<br />

plans and specifications shall be followed.<br />

B. The Contractor shall obtain all permits, inspections and approvals as required by all authorities<br />

having jurisdiction. All fees and costs of any nature whatsoever incidental to these permits,<br />

inspections and approvals must be assumed and paid by the Contractor.<br />

1.06 SHOP DRAWINGS:<br />

A. Shop drawings of fully descriptive catalog data shall be submitted by the Contractor for all items<br />

of material and equipment furnished and installed under this contract. The Contractor shall<br />

submit to the Architect a sufficient number of copies of all such shop drawings or catalog data to<br />

provide him with as many reviewed copies as he may need; plus two (2) copies for retention by<br />

the Architect and Engineer.<br />

B. Before submitting shop drawings to the Architect for review, the Contractor shall examine them<br />

and satisfy himself that they are correctly representative of the material or equipment to which<br />

they pertain. The Contractor shall so note on these drawings before submitting them. The<br />

Contractor's review of the shop drawings is not intended to take the place of the official review by<br />

the Architect, and shop drawings which have not been reviewed by Architect shall not be used in<br />

fabricating or installing any work.<br />

SUPPLEMENTARY MECHANICAL CONDITIONS 15010 - Page 1 of 4