10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations LLC..<br />

Invitation to Bid<br />

g. BFRC Post-ADAAG Stores ADA Consent Decree Compliance Certification Program.<br />

The series of forms and picture requirements are to be completed jointly between the<br />

General Contractor and the Developer/Fee Service Provider during the punchlist being<br />

prepared by the contractor 14 days prior to “Turnover”.<br />

The Developer/Fee Service Provider shall create a sub-folder within the “completed<br />

photos” tab of the photo album section of Projectmates. The picture requirements are to<br />

be uploaded into that subfolder. The title of the sub-folder is to read: “ADA PHOTOS”.<br />

The Developer/Fee Service Provider shall create a sub-folder within the “Closeout”<br />

section of Projectmates. Issue an email to the attention of Scot Dever, sdever@bfrc,<br />

requesting the sub-folder creation if one is not already visible and accessible on the<br />

system. The title of the sub-folder is to read “ADA FORMS”<br />

Form Requirements:<br />

BFRC Post-ADAAG Stores Contractor ADA Compliance Certification Form<br />

Post-ADAAG Store – BFRC Representative Non-Compliant Issues Resolution Form<br />

BFRC Survey Questions version 4.8.02 1.0- PostADAAG.XLS<br />

Picture requirements:<br />

1. A panoramic view of at least 4 stalls showing the Handicap stall(s) and the adjacent<br />

stalls (Normal stall/HC stall/Striped stall/Normal stall - A normal stall may be an area<br />

in which a car cannot access, example is landscaping). The required stalls to be<br />

shown in the photos could be increased due to the amount of handicapped stalls<br />

required at the location.<br />

2. Show all handicap signage.<br />

3. Show all striped paths and walkways from the Handicap stalls to the store entrance.<br />

4. Show all striping for ramps and/or access to ramps to the store entrance.<br />

5. Separate photo of entrance is needed if not visible in pictures listed above.<br />

If more than one photo is required to achieve what is mentioned above, then they must<br />

provide overlapping views. This is so the photos can be spliced if needed.<br />

h. Contractors Record Letters of Conformance: By submitting Letter of Conformance, the<br />

Contractor declares that the Product identified by manufacturer’s name and model<br />

number is (one of) the product(s) specified and is suitable for the intended use as<br />

defined within the Contract Documents and has been provided and placed in operational<br />

condition in accordance with the manufacturers published instructions and the Contract<br />

documents. Submit completed Letter of Conformance for each product elected as<br />

indicated within each Specification Section. Fill-in required information on the form and<br />

sign in ink by the person authorized to sign on behalf of the Contractor. No modifications<br />

to the form are permitted. Record Letters of Conformance are included, and can be<br />

found at the end of each applicable Specification Section. List of Record Letters of<br />

Conformance as follows:<br />

i. Start-Up of systems and Training Certification that include, but not limited to the building<br />

Mechanical, Plumbing, Electrical systems and if installed the Landscape Irrigation<br />

system (as noted below). Contractors shall start-up and test all systems and certify the<br />

date of complete and functional systems free of repair or defective parts or work. Each<br />

Subcontractor shall provide adequate training sessions for all equipment and systems<br />

signed off by the Bridgestone Retail Operations LLC. Construction representative,<br />

July 5, 2012 Updated New Store Invitation to Bid Revised 07-05-2012 Page 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!