Bridgestone/Firestone – Lakewood, CO Addendum June 21, 2012<br />

PSI Project No. 532281 Page 2 of 6<br />

Based on the potential for vertical movement due to the high swelling soils and<br />

Bridgestone/Firestone’s maximum allowable movement requirements (1 inch), it is PSI’s opinion<br />

that the proposed structures be supported on a drilled pier foundation system and that a structurally<br />

supported floor system be utilized. However, as an alternative to the drilled pier foundation system,<br />

PSI recommends that the proposed structures be placed on shallow footing foundations bearing on<br />

non-expansive imported structural fill.<br />

If the shallow footing foundation alternative is selected, PSI recommends that overexcavation<br />

and replacement with structural fill be performed within the building pad area to reduce the<br />

potential movement of the building due to swelling soils. This overexcavation should extend to a<br />

depth of 4 feet below bottom of footings, 7 feet total. It should be noted that these<br />

recommendations are based on a depth of wetting of 7 feet below grade, an average swell<br />

potential of 5 percent for native in-situ soils, an average swell percentage of 2.5 percent for<br />

moisture conditioned and compacted on site soils, and an average swell percentage of less<br />

than 1 percent for moisture conditioned and compacted non-expansive imported structural fill<br />

material.<br />

The engineering design team should perform a cost analysis of the various depths and type of<br />

structural fill and determine the amount of risk that may be tolerated from swelling soils. The<br />

overexcavation and replacement with on-site soils should extend 10 feet horizontally on the<br />

north, south and west sides and should extend 5 feet horizontally on the east side. Additionally,<br />

PSI recommends a 5 foot horizontal zone of inorganic/non-irrigated material around the<br />

proposed structure to reduce the potential infiltration of water to moisture-sensitive soils.<br />

On-Site Structural Fill Material<br />

Based on PSI’s field and laboratory data it is our opinion that on-site overburden soils will NOT be<br />

suitable for re-use as backfill soils and for use as structural fill. Also, the claystone bedrock should<br />

NOT be used as fill material.<br />

Imported Structural Fill<br />

Imported structural fill should be free of organic or other deleterious materials, have a liquid limit<br />

less than 30, a plasticity index less than 10, and meet the following gradation outlined below.<br />

This structural fill criteria is intended as a general guideline. Imported structural fill materials<br />

should have a swell potential of less than 1 percent when compacted to 95 percent of maximum<br />

dry unit weight (MDUW) and at 2 percent below optimum moisture content (OMC) and tested<br />

under a swell test surcharge of 500 psf. The MDUW and OMC should be determined by ASTM<br />

D698 (Standard Proctor).