Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

F. CODES<br />

1. Contractor shall submit his base bid in accordance with Drawings and Specifications. If<br />

Drawings and Specifications do not comply with any codes or utility company requirements<br />

having jurisdiction, then Contractor shall submit an alternate price on any changes<br />

necessary to comply with such codes. If such alternates are not stated in bid, it shall be<br />

assumed that Contractor's base bid includes all work necessary to comply with such codes<br />

or utility company regulations. No extras shall be paid for any work required for complying<br />

with such codes or for replacing work and materials in order to meet requirements of codes<br />

or utility company regulations having jurisdiction.<br />

2. If Drawings and Specifications call for an installation with requirements in excess of the<br />

minimum code requirements, the installation shall be made strictly in accordance with the<br />

Drawings and Specifications.<br />

G. INSPECTION OF WORK<br />

1. Contractor shall provide and keep on job a safety helmet for use of authorized<br />

representatives.<br />

2. In the event the specifications, laws, ordinances, or any public authority requires any part of<br />

work or materials to be specially tested or installation specially supervised, such testing and<br />

supervision shall be at Contractor's expense. Owner shall be notified in writing of time, date<br />

and place fixed for such testing and supervision.<br />

H. CONTRACTOR<br />

1. Attention is called to the Contractor that he shall provide a competent superintendent and<br />

any necessary assistants (all satisfactory to owner) in order to provide strict supervision over<br />

all Subcontractors. He shall familiarize himself with those portions of the Specifications and<br />

Drawings pertaining to the Subcontractors. The Contractor shall see that each of the<br />

Subcontractors under this Contract fully and faithfully completes all work in strict accordance<br />

with the provisions as set forth in the Drawings and Specifications as they pertain to those<br />

Subcontractors. General Contractor shall be held responsible for the failure of any of his<br />

Subcontractors to complete all the work in accordance with the Drawings and Specifications.<br />

2. Should the Contractor object to methods or materials specified, he shall notify Owner in<br />

writing and have same adjusted before proceeding with the work. Procedure without notice<br />

shall be construed as full acceptance of the Drawings and Specifications.<br />

I. SUBCONTRACTS<br />

1. General Contractor shall be held responsible for all material or labor furnished by<br />

Subcontractors. Owner reserves the right to accept or reject any Subcontractors and<br />

Contractor shall obtain Owner's approval before letting any Subcontracts or placing orders<br />

for materials.<br />

2. Subcontractor certification shall be required for hoist and “Firestone Rubber guard” roof<br />

installations.<br />

J. COOPERATION WITH OTHER CONTRACTORS<br />

1. Contractor shall collaborate with any Subcontractor for building of recess, openings, etc. or<br />

leaving holes as required by other Contractors. If proper notice and instructions are not given<br />

to Contractor prior to the erection of such work, Subcontractor shall then employ Contractor<br />

to do the work required for them at Subcontractor's expense.<br />

GENERAL PROJECT REQUIREMENTS 01002 - Page 2 of 7