Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

K. ACCEPTANCE OF OTHER CONTRACTOR'S WORK<br />

1. If any part of the Contractor's work depends for proper execution or results upon the work of<br />

any other Contractor, the Contractor shall inspect and promptly report to Owner any defects<br />

in such work that render it unsuitable for such proper execution and results. His failure to<br />

inspect and report shall constitute an acceptance of the other Contractor's work as fit and<br />

proper for the reception of his work, except as to defects which may develop in the other<br />

Contractor's work after the execution of his work..<br />

L. MATERIALS AND SUBSTITUTIONS<br />

1. Wherever any particular brand of material is specified, either on Drawings or Specifications,<br />

the same is to be regarded as a standard. If any other article of equal merit is proposed by<br />

Contractor, he must obtain owner's prior approval in writing. Where specifications list several<br />

Manufacturers of like materials, only those manufacturers' products are acceptable. If<br />

Contractor desires to use any other, written approval shall be obtained from Owner before<br />

accepting quotations or Purchasing materials manufactured by firms not specified. If<br />

Contractor purchases materials manufactured or fabricated by firms that are not listed in<br />

specifications, they do so at their own risk. No item other than specified will be considered if<br />

brought to site without previous written permission. All materials of special make where called<br />

for shall be furnished with all accessories necessary for proper installation as per<br />

manufacturer's recommendations and specifications.<br />

M. MATERIALS AND WORKMANSHIP<br />

1. Unless otherwise specifically provided by contract, change order or herein, all materials shall<br />

be new. Both workmanship and materials shall be of the best quality for their respective<br />

trades. Each Contractor shall be responsible for the satisfactory completion of all work under<br />

contract to him.<br />

2. In addition each Contractor shall provide, without extra charge, all incidental items required<br />

as a part of the work or required in order that various portions of building are completed in<br />

accordance with good construction and engineering practice. These are to be provided even<br />

though such items may not be specifically described or indicated, but are necessary to<br />

complete property the installation of the work. Each Contractor shall submit, without extra<br />

charge, evidence (satisfactory to Owner) that each item of material furnished under his<br />

contract fulfills the requirements of the specifications for such materials.<br />

3. It is the Owner’s intent that wherever possible, the Contractor shall select materials that have<br />

a recycled content or are available from a regional source.<br />

4. Should at any time improper, imperfect, or unsound material or faulty workmanship be<br />

observed, whether before or after the same shall have been brought into the structure, the<br />

Contractor shall, upon notice from the Owner, cause the same to be removed and good and<br />

proper material or work substituted therefore without delay. In the event the Contractor<br />

defaults in promptly handling the foregoing and after receipt of written notice by Owner of<br />

such default, Owner may resort to such other means as may be deemed necessary to<br />

correct such imperfections as described above. The cost of correcting these imperfections or<br />

such alterations shall be charged to the Contractor and the amount therefore deducted from<br />

the sum due to or recoverable from him under this contract.<br />

5. If Owner deems it inexpedient to correct work injured or work done not in accordance with<br />

Drawings, Specifications and contract, an equitable deduction from the contract price or<br />

refund to Owner shall be made therefore.<br />

GENERAL PROJECT REQUIREMENTS 01002 - Page 3 of 7