Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: Version: January 2012<br />

PART 3 EXECUTION<br />

3.01 PRECAUTIONS<br />

a. General Contractor shall employ drilling contractors who have adequate equipment to<br />

perform the required work.<br />

b. Make certain the drilling contractor is aware of the project requirements, unit prices, and<br />

the need to properly staff the work to meet the construction schedule.<br />

c. Make certain the drilling contractor is aware of all active underground utility lines.<br />

d. Where overhead power lines exist, observe proper clearances required by utility<br />

company.<br />

3.02 INSTALLATION<br />

a. Drill concentric pier shafts.<br />

b. Clean pier bearing surface utilizing drilling equipment to expose a bearing surface free of<br />

loose material. Provide for the protection of workmen when in excavation according to<br />

OSHA requirements. Pier bearing shall be free of standing water, foreign matter, or<br />

loose material.<br />

c. Allow inspection of pier shafts prior to reinforcing steel and concrete placement. Prevent<br />

foreign matter from falling into pier hole.<br />

d. Place reinforcing steel in accordance with Section 03300.<br />

e. Place concrete within eight (8) hours after pier hole is cleaned and in accordance with<br />

Section 03300. Use equipment designed for vertical placement of concrete. Vibrate<br />

concrete full depth of pier.<br />

f. Provide dowels for connection plinth and grade beams.<br />

g. Place concrete through a temporary casing if an inflow of subsurface water occurs. Place<br />

concrete to height sufficient to effect seal.<br />

3.03 FIELD QUALITY CONTROL<br />

a. The Special Inspector will inspect construction periodically throughout the various work<br />

stages, as defined in Chapter 17 of the IBC. In addition, the Special Inspector prior to the<br />

placing of concrete will inspect the formwork and placement of reinforcement.<br />

b. Notify the Architect and Owner's testing agency at least 72 hours in advance, excluding<br />

Saturday and Sunday, before drilling piers.<br />

3.04 TESTING LABORATORY SERVICES<br />

a. Provide continuous inspection of pier drilling operations to ascertain compliance with<br />

requirements of Contract Documents.<br />

DRILLED PIER FOUNDATIONS 02370 Page 2 of 3