10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

D. Do not allow panels or trim to come into contact with dissimilar materials (i.e. copper,<br />

lead, graphite, treated lumber, mortar, etc.). Water run-off from these materials is also<br />

prohibited.<br />

E. Comply with the SSRS Manufacturer’s approved installation drawings and instructions.<br />

F. Field cutting of panels, trim and/or flashing shall be accomplished by hand or electric<br />

shears. At no time shall a hotsaw be used.<br />

G. Snow Brackets: Install products in strict accordance with manufacturer’s written<br />

instructions and engineered layout charts.. Install with four 2 inch (51 mm) fasteners<br />

directly into sheathing with triangular end of bracket at eave end of shingle and upper<br />

end under shingle in course above.<br />

3.03 ADJUSTING AND CLEANING<br />

A. Repair panels with minor damage.<br />

B. Remove panels damaged beyond repair and replace with new panels to match adjacent<br />

undamaged panels.<br />

C. Clean exposed panel surfaces promptly after installation in accordance with<br />

recommendations of panel and coating manufacturers.<br />

D. Remove protective film immediately after installation.<br />

END OF SECTION<br />

METAL ROOFING SYSTEMS Section 07411 - Page 5 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!