10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

SECTION 02530<br />

ASPHALT PAVING<br />

PART 1 GENERAL<br />

1.01 RELATED DOCUMENTS:<br />

A. Drawings, Geotechnical Report and general provisions of Contract, Including General and<br />

Supplementary Conditions and Division 1 Specification Sections, apply to this section.<br />

1.02 SUMMARY<br />

A. Provide asphalt paving over prepared subbase where indicated:<br />

1. Parking areas.<br />

2. Driveways.<br />

B. Provide striping for parking, roadway, fire lanes and handicapped markings as indicated<br />

on drawings. (Refer to Specification Section 02577)<br />

1.03 SUBMITTALS<br />

A. Provide samples, manufacturer’s product data, test reports and materials’ certifications as<br />

required in referenced sections for concrete and joint fillers and sealers.<br />

1.04 QUALITY ASSURANCE<br />

A. Comply with local governing codes and regulations.<br />

B. Comply with State highway or transportation department standard specifications, latest<br />

edition, and with local governing regulations if more stringent than specified requirements.<br />

1.05 LAYER DESIGN THICKNESS AND TOLERANCES<br />

A. Provide prepared subgrade, granular base, bituminous base course and bituminous<br />

surface course as indicated on the civil drawings. Subgrade shall meet the requirements<br />

of Section 02200 – Earthwork and the Geotechnical Report.<br />

B. Construction Tolerances: Test finished surface of each course for smoothness using 10<br />

foot straightedge, applied parallel with, and at right angles to, centerline of paved area.<br />

Surfaces will not be accepted if exceeding the following tolerances and smoothness:<br />

1. Base Course Thickness: Within ½ inch.<br />

2. Surface Course Thickness: Within ¼ inch.<br />

3. Base Course Surface Smoothness: Within ¼ inch.<br />

4. Surface Course Surface Smoothness: Within 3/16 inch. No ponding acceptable.<br />

5. Crowned Surfaces: Within ¼ inch from template.<br />

1.06 PROJECT CONDITIONS<br />

A. Weather limitations:<br />

1. Apply prime and tack coats when ambient temperature is above 50º F, and when<br />

temperature has not been below 35º F for 12 hours immediately prior to<br />

application. Do not apply when base is wet, frozen or contains an excess of<br />

moisture.<br />

2. Base course mixtures shall not be placed when either the temperature of the<br />

surface on which the mixture is to be placed is below 40º F, on any wet or frozen<br />

surface, or when weather conditions prevent the proper handling and finishing<br />

of the mixture.<br />

3. Surface course mixtures shall not be placed when either the air temperature or<br />

the temperature of the surface on which the mixture is to be placed is below 50º<br />

F, on any wet or frozen surface, or when weather conditions prevent the proper<br />

handling or finishing of the mixture.<br />

ASPHALT PAVING 02530 - Page 1 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!