Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

All reports shall be made on 8-1/2 x 11 white papers, suitable for photocopying and binding in<br />

booklet form. All sheets shall have the Testing and Engineer’s letterhead (including phone number,<br />

address and email address). Larger sheets shall be folded and bound into the booklet. Reports<br />

shall include:<br />

a. Date issued<br />

b. Project title and number as it appears on the Contract Documents.<br />

c. Name of the inspector<br />

d. Name and seal of registered engineer in responsible charge.<br />

e. Date and time of sampling or inspection.<br />

f. Identification of product and specification section.<br />

g. Location of sampling or inspection in the Project.<br />

h. Type of inspection or test performed.<br />

i. Date of test.<br />

j. Results of test.<br />

k. Indicate conformance or non-conformance with the Contract Document requirements and<br />

provide Testing and Engineer’s interpretation of test or inspection results.<br />

All tests and inspections not conforming to the Contract Documents shall be stamped with a red<br />

stamp indicating non-0conrormance and distributed within 20 hours of discovery using the red letter<br />

format attached to this document.<br />

After each inspection or test, a report shall be distributed within three calendar days to:<br />

Bridgestone Retail Operations, LLC Zone Construction Manager<br />

SITE-Work Engineering Consultant<br />

Developer or Contractor<br />

Building Official<br />

Architectural Consultant<br />

1 copy<br />

1 copy<br />

3 copies<br />

as Required<br />

1 copy<br />

3.10 Structural Inspection Services Shall Include:<br />

Concrete Foundations and Slabs-on-Grade:<br />

a. Inspect foundations for compliance with Drawings and Specifications. Report on the following:<br />

• Concrete footing size and depth.<br />

• Footing rebar size, spacing and placement (cover).<br />

• Placement and vibration of concrete.<br />

• Dowel bar size, orientation, embedment and spacing.<br />

• Anchor bolt size, orientation, embedment and spacing.<br />

b. Inspect slabs-on-grade for compliance with Drawings and Specifications. Report on the<br />

following:<br />

• Preparation of subgrade.<br />

• Slab thickness.<br />

• Size, spacing, placement (cover) and lap of reinforcement, if applicable.<br />

• Size, spacing and placement of joint dowels.<br />

• Placement and finishing of concrete.<br />

• Time of saw cuts after placement of concrete.<br />

Masonry Walls:<br />

a. Inspect walls for compliance with Drawings and Specifications. Report on the following:<br />

• Placement of concrete masonry units (joint space, level, plumb).<br />

• Horizontal reinforcing, spacing and lap.<br />

• Vertical bar size, spacing and placement (spacing across width of wall) at walls and control<br />

joints.<br />

• Vertical bar laps.<br />

QUALITY REQUIREMENTS 01400 - Page 9 of 11