Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

writing of any such difference. Should any work be performed that does not comply with the<br />

requirements of the applicable codes and utility company regulations, the contractor shall bear<br />

all costs arising in correcting these deficiencies.<br />

D. In addition to local, county, and state ordinances and the utility company regulations, the<br />

following industry standards and codes shall apply as applicable except where the<br />

requirements of this specification are more stringent than the following standards, they shall<br />

take precedence<br />

1. ASTM - American Society of Testing Material<br />

2. IEEE - Institute of Electrical and Electronics Engineer<br />

3. IES - Illuminating Engineering Society<br />

4. NEC - National Electric Code<br />

5. NEMA - National Electrical Manufacturers' Association<br />

6. NFPA - National Fire Protection Association<br />

7. UL - Underwriters' Laboratories<br />

1.05 SPECIAL CONSIDERATION<br />

A. The manufacturer's published directions shall be followed in the delivery, storage, protection,<br />

installation, piping, and wiring of all equipment and material. Promptly notify the Architect in<br />

writing of any conflict between the requirements of the Contract Documents and the<br />

manufacturers' directions and shall obtain the Architect's instructions before proceeding with<br />

the work. Should any work be performed that does not comply with the manufacturers'<br />

directions or such instructions from the Architect, the contractor shall bear all costs arising in<br />

connection with the deficiencies.<br />

B. Comply with all local customs as to which particular trade shall install any part or parts of any<br />

work or equipment specified under the heading of electrical work and plan and execute work<br />

so as not to interfere with other contractors in the building.<br />

1.06 GUARANTEE<br />

A. Furnish the name, address and telephone number of those persons responsible for service on<br />

systems and equipment covered by the "Guarantee".<br />

B. All work shall be guaranteed for a period of one year from date of final completion.<br />

C. Upon notice of any electrical malfunction, remedy the malfunction including all materials,<br />

equip-ment, and labor at no cost to the Owner.<br />

D. In addition to the guarantee herein specified, each piece of electrical equipment shall be<br />

provided with the standard manufacturer's warranties for the number of years as specifically<br />

noted.<br />

1.07 RESPONSIBILITY OF THE CONTRACTOR<br />

A. Each contractor shall be responsible for all work of every description in connection with his<br />

contract. He shall specifically and distinctly assume, and does so assume, all risk for damage<br />

or injury from whatever cause to property or person used or employed on or in connection with<br />

his work and of all damage or injury to any persons or property wherever located, resulting<br />

from any action of operation under the contract or in connection with the work, and undertake<br />

the promise to defend the Owner against all claims on account of any such damage or injury.<br />

B. Each contractor will be held responsible for the execution of a satisfactory and complete piece<br />

of work, in accordance with the true intent of the drawings and specifications and all bulletins<br />

and addenda which may be issued during the time of bidding. He shall provide, without extra<br />

charge, all incidental items required as a part of his work, even though not particularly<br />

specified or indicated, and if he has good reason for objecting to the use of any materials,<br />

appliance or method of construction shown or specified, he shall make report of such<br />

objections to the Engineer and obtain proper adjustment before the Contract is made, and<br />

shall proceed with the work, only with the understanding that a satisfactory job is required.<br />

C. Each contractor shall be responsible for compliance with all national, state, local and county<br />

codes, standards, ordinances and regulations.<br />

ELECTRICAL SPECIAL CONDITIONS 16010 - Page 2 of 7