10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

PART 3 EXECUTION<br />

3.01 EXAMINATION<br />

A. Verify that surfaces to receive flashing are thoroughly dry, free from dirt, oil, grease and other<br />

materials, reasonably smooth and without any sharp edges, fins, loose or foreign materials that<br />

may damage membrane.<br />

1. Do not use open flame sources or any other means to expedite drying of adhesives, sealants<br />

or primers.<br />

B. Roughened surfaces that could cause damage shall be properly isolated from the membrane.<br />

C. Verify that locations to receive flashing are sloped so water that enters will drain to building exterior<br />

face.<br />

3.02 PREPARATION<br />

A. Properly fill voids of sheet flashing substrate surface greater than ¼ inch wide with appropriate<br />

material such as mortar or grout.<br />

B. Remove any moisture on the substrate prior to installation.<br />

3.03 INSTALLATION<br />

A. Coordination: Interface flashing work with adjacent and adjoining work to ensure weather<br />

resistance and durability of completed flashing.<br />

B. Install sheet flashing in accordance with manufacturer’s written instructions and details.<br />

C. Upon completion of the masonry veneer installation, trim the sheet flashing as indicated on the<br />

Drawings to form a drip edge. Do not terminate sheet flashing within the mortar joint.<br />

END OF SECTION<br />

EPDM SHEET FLASHING 07650 - Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!