Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

S. CONTROLLED MATERIALS<br />

1. Where materials are required by the Governing Building Codes to be certified by an<br />

accredited authoritative agency as meeting accepted engineering standards for quality, the<br />

certification shall be furnished by the Contractor.<br />

T. SCHEDULES & ESTIMATES<br />

1. Immediately after execution and delivery of the contract, the Contractor shall deliver to the<br />

Owner a "Building Progress Schedule" showing the proposed dates of commencement and<br />

completion of each of the various sub-divisions of work required under this project.<br />

Contractor shall keep schedule updated at least bi-weekly.<br />

2. Within twenty (20) days after execution of Contract, Contractor shall name all Subcontractors<br />

and material dealers from whom materials will be purchased for this project.<br />

3. In the case that work is not completed within the allotted time frame the Contractor will be<br />

responsible for Liquidated Damages.<br />

4. He shall submit a breakdown (Schedule of Values) of the contract price, by trade, to the<br />

Owner on the Schedule of Value form. This "Schedule of Values" when approved by Owner<br />

shall be the basis of computing monthly estimates of work completed on the project.<br />

U. SHOP DRAWINGS<br />

1. Contractor shall submit with such promptness as to cause no delay in his own work or in that<br />

of any other Contractor, three copies of all shop or setting drawings and schedules required<br />

for the work of the various trades. Owner shall waive the requirement of all shop drawing<br />

submittals when Contractor intends to supply materials exactly matching the drawings and<br />

specifications with the exception of: pre-engineered building reaction loads and anchor bolt<br />

layouts; reinforcing steel; HVAC equipment. Contractor must submit shop drawings for all<br />

proposed "equal” substitution products. Owner shall pass upon submitted drawings with<br />

reasonable promptness making desired corrections, including all necessary corrections<br />

relating to artistic effect. Contractor shall make all corrections required by Owner, file with him<br />

two corrected copies and furnish such other copies as may be needed. Owner's approval of<br />

such drawings or schedules shall not relieve Contractor from responsibility for deviations<br />

from drawings or specifications, unless he had in writing called Owner's attention to such<br />

deviations at the time of submission, nor shall it relieve him from responsibility for errors of<br />

any sort in shop drawings or schedule.<br />

V. PERMITS AND FEES<br />

1. Refer to Invitation To Bid Section 13: Permits, Fees and Inspections.<br />

W. MODEL ENERGY EFFICIENCY CODE REQUIREMENTS<br />

1. When required, Contractor shall obtain and submit the fully executed Energy Efficiency-<br />

Forms and Calculations to the governing authorities having jurisdiction. Contractor shall<br />

furnish Owner with a copy of the executed form and calculations. All fees pertaining to the<br />

above shall be paid by the Contractor.<br />

GENERAL PROJECT REQUIREMENTS 01002 - Page 5 of 7