10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

C. Halsey Taylor<br />

PART 3 EXECUTION<br />

3.01 PREPARATION<br />

A. Rough-in fixture piping connections in accordance with the requirements of the drawings, fixture<br />

manufacturer recommendations, industry standards, and applicable codes.<br />

3.02 INSTALLATION<br />

A. Install each fixture with trap, easily removable for servicing and cleaning.<br />

B. Provide chrome plated rigid or flexible supplies to fixtures with loose key stops, reducers, and<br />

escutcheons.<br />

C. Install components level and plumb.<br />

D. Install and secure fixtures in place with wall supports and bolts.<br />

E. Seal fixtures to wall and floor surfaces with sealant as specified in Section 07900, color to match<br />

fixture.<br />

F. Solidly attach water closets to floor with lag screws. Lead flashing is not intended hold fixture in<br />

place.<br />

3.03 ADJUSTING<br />

Adjust stops or valves for intended water flow rate to fixtures without splashing, noise, or overflow.<br />

3.04 CLEANING AND PROTECTION<br />

Clean plumbing fixtures and equipment.<br />

END OF SECTION<br />

PLUMBING FIXTURES 15410 - Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!