Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

6. The Contractor shall be fully responsible for the safety and good condition of all work and<br />

materials in his contract until the completion of his contract as an entirety. In addition,<br />

Contractor shall be responsible for fulfilling his obligation of providing all materials and<br />

executing all work in strict accordance with drawings and specifications for a period of one<br />

year from date of completion of project.<br />

N. PAYMENT AND LIEN WAIVER<br />

1. Beginning with the first application for payment, the Contractor shall submit a notarized<br />

Waiver of Right of Lien for material and labor (which is in place and paid for) from all Sub-<br />

Contractors and suppliers included in the applicable payment.<br />

O. MATERIALS FURNISHED BY OWNER<br />

1. Contractor shall refer to Section 01003 of these Specifications for materials to be furnished<br />

by Owner and installed by Contractor. Those materials will be supplied by Owner, F.O.B. job<br />

site and shall be stored by Contractor (see paragraph immediately below) and installed by<br />

Contractor or respective Subcontractor. In the absence of any notes or statements on<br />

Drawings, or in specifications, to the effect that various materials to complete job are to be<br />

furnished by Owner, they shall be furnished by Contractor.<br />

P. RECEIVING AND CARING FOR MATERIAL FURNISHED BY OWNER<br />

1. General Contractor shall be held responsible for receiving and safeguarding of all material<br />

furnished by Owner. General Contractor shall receive all items from the shipper,, unload,<br />

check and sign the bill of lading as to number of items received, description, weight and for<br />

visible or concealed damage. He shall examine this material when it is received. If any<br />

damage is found or if any items are missing from shipment that are called for on carriers<br />

delivery ticket all shall be immediately called to the attention of carriers agent. Notations of<br />

such damage or shortages shall be made on the delivery ticket or bill of lading, or in any<br />

other manner in accordance with the requirements of that particular carrier. General<br />

Contractor shall obtain the signature of carrier's agent to this notation of damage or<br />

shortage. Such papers and notations shall then be delivered to Owner immediately to enable<br />

Owner to file necessary claim. In the event such damages or shortages are not noted then it<br />

shall be contractors obligations to furnish new items of equal quality to complete the project.<br />

2. General Contractor to advise and confirm exact street address and postal zip code for<br />

deliveries.<br />

Q. STORAGE SHED<br />

1. Contractor shall provide shed for safe storage of such material as may be damaged by<br />

weather including materials furnished by Owner. Contractor shall keep shed in good repair<br />

and when it is no longer needed remove from site.<br />

R. MANUFACTURER'S WARRANTIES<br />

1. Manufacturer's warranties on installed equipment and other building items, as well as<br />

Subcontractor and supplier warranties and guarantees, express or implied, respecting any<br />

part of the work and any materials used therein shall be deemed obtained and shall be<br />

enforced--by the Contractor as the agent for the benefit of the owner.<br />

2. Contractor shall furnish copies of the warranties of the equipment or building items where<br />

such warranties have been issued by manufacturer.<br />

GENERAL PROJECT REQUIREMENTS 01002 - Page 4 of 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!