10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

3.04 EXCESS AND UNSUITABLE MATERIAL:<br />

A. All excess and/or unsuitable excavated material shall be loaded and hauled offsite by the<br />

Contractor and disposed of in a legal manner.<br />

END OF SECTION<br />

PARKING LOT EXCAVATION AND BACKFILL 02227 - Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!