10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

PART 3 EXECUTION<br />

3.01 EXAMINATION<br />

A. Verification of Conditions:<br />

1. Beginning construction activities of this section indicates installer's acceptance of conditions.<br />

3.02 INSTALLATION<br />

A. Install toilet accessories plumb and level in accordance with manufacturer's printed installation<br />

instructions.<br />

B. Locate toilet accessories at heights specified by Americans with Disabilities Act (ADA).<br />

C. Verify locations with drawings.<br />

3.03 CLEANING<br />

A. Remove manufacturer's protective vinyl coating from sight-exposed surfaces 24 hours before final<br />

inspection.<br />

B. Clean surfaces in accordance with manufacturer's recommendations.<br />

3.04 PROTECTION OF INSTALLED PRODUCTS<br />

A. Protect products from damage caused by subsequent construction activities.<br />

B. Field repair of damaged product finishes is prohibited; replace products having damaged finishes<br />

caused by subsequent construction activities.<br />

END OF SECTION<br />

TOLIET ACCESSORIES 10810 - Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!