SECTION 02226<br />

PIPE TRENCH EXCAVATION AND BACKFILL<br />

PART 1 GENERAL<br />

1.01 GENERAL REQUIREMENTS<br />

A. This specification shall govern for all work necessary to accomplish the pipe trench<br />

excavation for all piping required to complete the project. This specification is a performance<br />

specification and the performance of the completed work is the responsibility of the<br />

Contractor.<br />

PART 2<br />

PRODUCTS<br />

2.01 GENERAL:<br />

A. Trench excavation shall include all material encountered including dirt, asphalt, base<br />

material, concrete, masonry, rock, trees, stumps and roots. Trench excavation will not be<br />

measured.<br />

PART 3 EXECUTION<br />

3.01 TRENCHES EXCEEDING 5 FEET IN DEPTH:<br />

A. TRENCH EXCAVATION SAFETY:<br />

3.02 RESPONSIBILITY:<br />

1. The Contractor's trench excavation safety procedures shall, in all respects, meet the<br />

current standards established by the U. S. Department of Labor, Occupational Safety and<br />

Health Administration (OSHA) on excavation, trenching and shoring.<br />

A. Contractor has the sole and exclusive responsibility for the sufficiency of the trench<br />

excavation safety systems utilized.<br />

B. The Contractor shall specifically agree that neither the Owner nor the Engineer has such<br />

responsibility, and Contractor will not rely on the Owner or the Engineer or any of their<br />

representatives for inspection, design, supervision, construction or any other aspect of trench<br />

excavation safety protection.<br />

C. Contractor shall fully indemnify, safe and hold harmless Owner and Engineer, their<br />

employees and agents (hereinafter the Indemnities) against any and all liability, damage,<br />

loss, claims, demands and actions of any nature whatsoever on account of personal injuries<br />

(including, without limitation on the foregoing, workers' compensation and death claims), or<br />

property loss or damage of any kind whatsoever, which arise out of or are in any manner<br />

connected with, or are claimed to arise out of or be in any way connected with, the<br />

negligence of the Contractor in the inspection, design, engineering, supervision, construction,<br />

safety devices or other activity connected with the trench excavation safety protection under<br />

this Agreement.<br />

D. Contractor shall, at his own expense, investigate all such claims and demands, attend to their<br />

settlement or other disposition, defend all actions based thereon and pay all charges of<br />

attorneys and all other costs and expenses of any kind arising from any such liability,<br />

damage, loss, claims demands, and actions.<br />