10.03.2015 Views

Specs

Specs

Specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

B. The gutter shall be installed by using a free-floating hanger systems so movement is not restricted.<br />

Spikes and ferrules or brackets attached to the outside periphery of the gutter shall not be used.<br />

Hangers should be located a maximum of 32" (812) apart and nailed to the roof sheathing or fascia<br />

board at rafter locations wherever possible with two 1-1/4" (31.7) or 1-1/2" (38.1) Alcoa aluminum<br />

screw shank nails.<br />

C. Expansion joints should be used on all hip roof installations, on straight runs over forty feet in<br />

length or any conditions where normal movement due to expansion and contraction is restricted.<br />

B. A visual inspection of entire project should be conducted. All problem areas should be replaced and<br />

repaired in accordance with manufacturer's recommendations.<br />

C. Upon completion, contractor shall clean all aluminum work and remove all scrap materials.<br />

3.02 Protection<br />

A. Care must be exercised in placing aluminum in contact with dissimilar materials.<br />

B. Aluminum shall not be installed in contact with dissimilar metals, concrete, stucco, asbestos siding,<br />

masonry, or corrosive non-metallic materials which might become repeatedly wet.<br />

END OF SECTION<br />

RAIN REMOVAL SYSTEM 07710 - Page 3 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!