Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

3.03 TRENCHES 5 FEET OR LESS IN DEPTH:<br />

A. The Contractor shall maintain vertical sides of the trench. The minimum and maximum width<br />

of trench is set out on the Drawings.<br />

B. The Contractor shall provide and install any sheeting, shoring and bracing as necessary to<br />

provide a safe work area as required to protect workmen, structures, equipment, trees, etc.<br />

The Contractor shall be responsible for the design and adequacy of all shoring, bracing and<br />

sheeting. The Contractor shall remove shoring, bracing and sheeting, as the excavation is<br />

backfilled, in such a manner as to prevent injurious caving.<br />

3.04 CONSTRUCTION METHODS<br />

A. The Contractor shall schedule the excavation of pipe trenches at such times and in such<br />

sequence as to present the least interference with other items of the work and the operation<br />

of the existing facilities.<br />

B. The Contractor shall place excavated material in a manner that will not endanger the work,<br />

and will avoid obstructing sidewalks and driveways. Gutters shall be kept clear.<br />

3.05 UNAUTHORIZED OVEREXCAVATION:<br />

A. If the Contractor should excavate below the proposed trench grade (without authorization of<br />

the Engineer) the Contractor shall correct the grade by filling in with cement stabilized sand<br />

or crushed stone embedment as shown on the drawings.<br />

3.06 TREES, STUMPS OR ROOTS:<br />

A. Where trees, stumps or roots are encountered, and they shall be removed and disposed of<br />

by the Contractor. Roots shall be cut off flush with the sides of the trench.<br />

3.07 ROCKS, BOULDERS, EXISTING STRUCTURES, ETC.:<br />

A. Where rocks, boulders, existing structures or other unsuitable soil conditions are<br />

encountered, they shall be removed by the Contractor to a depth of 12 inches below the<br />

grade line for the full width of the trench and refilled with cement or crushed stone<br />

embedment.<br />

3.08 MAINTENANCE OF FLOW IN SEWERS AND DRAINS:<br />

A. The Contractor shall made adequate provision for maintaining the flow of sewers and drains<br />

encountered during construction.<br />

3.09 DEWATERING:<br />

A. The Contractor shall keep the pipe trench free from water by use of bailing, pumping, well<br />

points or any combination as the particular situation may warrant. It is the intent of these<br />

specifications to install pipe on a firm dry bed.<br />

B. All dewatering methods and procedures are subject to the approval of the Engineer. The<br />

cessation of the dewatering operation will be accomplished during a sufficient period of time<br />

to insure that there is no displacement of the pipe due to unequal hydrostatic pressure.<br />

3.10 UNSTABLE TRENCH BOTTOM:<br />

A. When the soil encountered at the established bedding grade is quicksand, muck or similar<br />

unsuitable material, the Contractor shall proceed as follows:<br />

PIPE TRENCH EXCAVATION AND BACKFILL 02226 - Page 2 of 4