Bridgestone Retail Operations, LLC<br />

PROJECT MANUAL<br />

Version: January 2012<br />

2.02 MATERIALS:<br />

A. Sheathing: Glass Mat Faced Exterior Sheathing shall be Dens-Glass Gold Sheathing by G-P<br />

Gypsum Corporation, Atlanta GA (800/ 947-4497 Northeast US), subject to acceptance by<br />

the EIFS manufacturer as part of the warranted EIFS system. Paper-faced exterior gypsum<br />

sheathing is NOT an acceptable product substitution.<br />

B. Sheathing at Building Signage: Do NOT provide Glass Mat Faced Exterior Sheathing without<br />

also providing exterior plywood sheathing backup at any location where signage is scheduled<br />

to be provided; in lieu of Glass Mat Faced Exterior Sheathing at these locations, the<br />

Contractor may provide Exterior Plywood Sheathing, subject to acceptance by the EIFS<br />

manufacturer as part of the warranted EIFS system.<br />

C. Nominal 1.0 lb./cu.ft. (16 kg/m 3 ) Expanded Polystyrene (EPS) Insulation Board in compliance<br />

with ASTM C 578 Type I requirements, and EIMA Guideline Specification for Expanded<br />

Polystyrene (EPS) Insulation Board. Minimum thickness ¾”. See Drawings.<br />

D. Expanded Polystyrene less than 25 flame spread, 1.0 lb./per cu. Ft. average density; u = 0.26<br />

per inch; ASTM C578-85 Class A.<br />

Dimensional tolerance shall be as follows:<br />

1. Edges shall be square within 1/16” over the entire length of the board.<br />

2. Thickness shall be plus or minus 1/16”.<br />

3. Foam shall be aged by air drying for a minimum of six weeks or equivalent kiln dried.<br />

PART 3<br />

EXECUTION<br />

3.01 SURFACE CONDITIONS: The Contractor shall examine the areas and conditions under which<br />

work of this Section will be provided, shall correct conditions detrimental to timely and proper<br />

completion of the work, and shall NOT proceed until unsatisfactory conditions are corrected.<br />

3.02 INSTALLATION:<br />

A. The Water Managed EIFS manufacturer’s specifications and recommended standard<br />

installation details shall be followed completely, and shall be considered a part of this section<br />

as if the manufacturer’s specification was included in its entirety.<br />

B. Install the work of this section in accordance with the shop drawings and with pertinent<br />

requirements of governmental agencies having jurisdiction, anchoring all components firmly<br />

into position straight, level, and plumb within a tolerance of 1:1000 vertical and horizontal.<br />

C. All installation of E.I.F.S. Materials shall be performed by and/or supervised by applicators<br />

who carry a certificate of training by the Manufacturer. Contractor must have a minimum<br />

industry experience with EIFS systems no less than 5 years and must have completed 10+<br />

projects of similar size.<br />

Under no circumstances shall any of the E.I.F.S. Products be altered by adding any additives,<br />

except for small amounts of clean water as directed on label. Antifreeze, accelerators, rapid<br />

binders, etc., are forbidden.<br />

D. The overall minimum base coat thickness shall be sufficient to fully embed the mesh in<br />

multiple base coat applications.<br />

EIFS 07240 - Page 2 of 3