19.08.2013 Views

Safety Integrated - Industry - Siemens

Safety Integrated - Industry - Siemens

Safety Integrated - Industry - Siemens

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ex. No.<br />

7<br />

Function test<br />

After wiring the hardware components you can check the inputs<br />

and outputs used with regard to their functionality (after<br />

downloading the S7 project).<br />

Inputs/outputs used<br />

No. Hardware<br />

component<br />

Testing inputs and outputs<br />

Requirements: The inputs and outputs have the default values<br />

specified under "Inputs/outputs used".<br />

Warning!<br />

The instructions listed in the table below should first<br />

be performed without activated load circuit.<br />

An acknowledgement is required<br />

■ when starting for the first time<br />

■ after unlocking the emergency stop<br />

■ after reintegration (module was passivated) of the failsafe<br />

input module (F-DI) of the ET 200S<br />

■ after exceeding the read-back time in the feedback circuit<br />

monitoring<br />

250 Functional Example No. AS-FE-I-007-V10-EN<br />

Adress Symbol Signal<br />

(default value)<br />

1 Push button (NO) E 0.0 START "0" Start request<br />

2 Push button (NC) E 0.1 STOP "1" Stop request<br />

3 Push button (NO) E 1.0 ACK "0" Acknowledgement<br />

4 Contactor auxiliary contact (NC) E 1.1 K1_HELP "1" Readback signal<br />

5 Contactor auxiliary contact (NC) E 2.0 K2_HELP "1"<br />

6 Emergency stop push button E 3.0 ESTP "1" –<br />

7 Magnet coil contactor A 9.0 K1_K2 "0" –<br />

No. Instruction<br />

Response<br />

Note<br />

A 9.0 K1 K2 Motor<br />

1 Press the push button E 1.0 and<br />

release it.<br />

"0" not activated AUS Acknowledgement<br />

2 Press the push button E 0.0 and<br />

release it.<br />

"1" activated AN Start request<br />

3 Press the push button E 0.1 and<br />

release it.<br />

"0" not activated AUS Stop request<br />

4 Repeat no. 2. "1" activated AN Start request<br />

5 Press the emergency stop<br />

not activated<br />

Activate emergency stop<br />

(E 3.0). "0"<br />

AUS<br />

6 Unlock the emergency stop. not activated –<br />

7 Repeat no. 1 and 2. "1" activated AN Acknowledgement and start request<br />

8 Press the push button E 0.1 and<br />

release it.<br />

"0" not activated AUS Stop request<br />

Note

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!