19.08.2013 Views

Safety Integrated - Industry - Siemens

Safety Integrated - Industry - Siemens

Safety Integrated - Industry - Siemens

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Explanations for the STEP 7 program<br />

Interaction of STEP 7 blocks<br />

The following figure displays the interaction between the<br />

STEP 7 blocks and the connection to the process I/O. The description<br />

of the process signals is available at page 321.<br />

Program Block Name Tasks<br />

Standard program OB1 --- Cyclic program: Call of FB1 (START)<br />

OB35 --- Periodic call of F-runtime group (FCALL)<br />

FB1 START Operational switching:<br />

Generating the start requirement (REQ_START)<br />

<strong>Safety</strong> program FCALL FCALL F run-time group (FCALL)<br />

F-PB COORDINATION F-program block:<br />

Calls FB2 and FB3<br />

FB2 MODE Call FB215 (F_ESTOP1):<br />

Controlling ACTUATOR and TEST<br />

FB3 REINTEGRATION Display passivation, automatic F-DI reintegration, manual F-DI<br />

and F-DO reintegration,<br />

FB215 F_ESTOP1 F-block from Distributed <strong>Safety</strong> library:<br />

"Emergency stop up to stop category 1"<br />

Creating ENABLE for emergency stop circuit<br />

Functional Example No. AS-FE-I-011-V10-EN 335<br />

Ex. No.<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!