19.08.2013 Views

Safety Integrated - Industry - Siemens

Safety Integrated - Industry - Siemens

Safety Integrated - Industry - Siemens

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ex. No.<br />

5.2<br />

■ To start the motor data identification routine, in the Project<br />

Navigator select the menu item Commissioning and activate<br />

by double clicking on Control panel.<br />

■ Press Assume control priority and carefully note the security/safety<br />

information and instructions. Then activate<br />

Enables.<br />

■ The motor data identification routine is started by pressing<br />

the button. Do not exit the STARTER software and go to<br />

another task as otherwise the motor data identification<br />

routine will be interrupted for safety reasons.<br />

506 Functional Example No. SD-FE-I-002-V10-EN<br />

■ Please wait until the button changes back to the<br />

button.<br />

■ Return the control priority to the S7 control by pressing the<br />

button.<br />

■ Finally, you only have to save the SINAMICS G120 configured<br />

software in the ROM memory of the drive inverter.<br />

To do this in the Project Navigator select the menu item<br />

SINAMICS_G120.<br />

■ In the function bar press the button.<br />

■ Please wait until the download operation has been completed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!