Settings of the failsafe F-DO<br />

The settings are displayed after double-clicking "4 F-DO<br />

DC24V/2A" (see "Overview picture").<br />

DIL switch settings<br />

This value has to be set on the module (F-DO).<br />

F monitoring time<br />

It has to be observed that the F monitoring time must be<br />

larger than the call time of OB 35.<br />

Activate the used channel 0, deactivate channels (1, 2, 3)<br />

which are not used.<br />

The output of channel 0 provides the pick-up/drop-out of the<br />

contactor coils of K1 and K2.<br />

The read-back time defines the duration of the switch-off process<br />

for the respective channel. If the respective channel<br />

switches high capacity loads the read-back time should be set<br />

sufficiently. We recommend to set the read-back time as small<br />

as possible by trying, however large enough to ensure that the<br />

output channel is not passivated.<br />

Settings for the readback signals<br />

The readback signals ("K2_HELP" is shown in the screenshot)<br />

are read in via a standard input module of the ET 200S; they<br />

don't have to be read via a failsafe input module.<br />

Functional Example No. AS-FE-I-007-V10-EN 253<br />

Ex. No.<br />

7