15.11.2014 Views

World Energy Outlook 2007

World Energy Outlook 2007

World Energy Outlook 2007

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

e built, because of concerns about the environmental impact, the price<br />

of the gas (which is expected to be comparable to European levels) and the time<br />

scale for development of Russian gas fields and the related infrastructure.<br />

A 3 000-km pipeline from Kazakhstan to the Xinjiang province is also planned<br />

and is supposed to come on stream in 2009. Initial capacity would be 10 bcm<br />

per year, rising to 30 bcm in 2012. Gas is due to come mainly from<br />

Turkmenistan, following the deal signed recently by CNPC to receive 30 bcm<br />

per year over 30 years, as well as from the gas fields of other Central Asian<br />

countries.<br />

Table 10.6: LNG Regasification Terminals in China<br />

Terminal Location Main Status Start-up Initial<br />

(province) operator capacity<br />

(bcm)<br />

Shenzhen Guangdong CNOOC/BP Operating 2006 5.0<br />

Shenzhen Guangdong CNOOC/BP Under construction 2008 2.7<br />

(extension)<br />

Putian Fujian CNOOC Under construction 2009 3.5<br />

Putian Fujian CNOOC Under construction 2010 3.3<br />

(extension)<br />

Yangshan Shanghai Shanghai LNG Under construction 2009 4.1<br />

(CNOOC,<br />

Shenergy)<br />

Subtotal existing and under construction 18.6<br />

Qingdao Shangdong Sinopec Feasibility study After 4.1<br />

completed 2010<br />

Ningbo Zhejiang CNOOC, Feasibility study After 4.1<br />

Zhejiang 2010<br />

<strong>Energy</strong> Group<br />

Rudong Jiangsu PetroChina Feasibility study After 4.8<br />

completed 2011<br />

Tangshan Hebei PetroChina Feasibility study After 4.1<br />

completed 2010<br />

Dalian Liaoning PetroChina Feasibility study 2012 4.1<br />

completed<br />

Tianjin Tianjin Sinopec Pre-feasibility study 2012 2.7<br />

Beihai Guangxi PetroChina Unknown After 4.1<br />

2010<br />

Subtotal under consideration 28.0<br />

Total 46.6<br />

10<br />

Sources: Company reports and IEA estimates.<br />

Chapter 10 - Reference Scenario Supply Projections 333

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!